Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0450 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,892 | $5,813 | Implemented |
MA0450 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $1,042 | $1,000 | Implemented |
MA0450 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $75,618 | $250,000 | Not Implemented |
MA0450 # 04 Y:1999 | 04 | 1999 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $456 | $1,275 | Not Implemented |
MA0450 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,423 | $5,216 | Implemented |
MA0450 # 06 Y:1999 | 06 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $537 | $0 | Implemented |
MA0447 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $504 | $455 | Not Implemented |
MA0447 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $591 | $120 | Implemented |
MA0447 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,321 | $45,420 | Not Implemented |
MA0447 # 03 Y:1999 | 03 | 1999 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,511 | $2,500 | Not Implemented |
MA0447 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,131 | $4,925 | Implemented |
MA0447 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,407 | $19,500 | Not Implemented |
MA0447 # 07 Y:1999 | 07 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $473 | $748 | Implemented |
MA0447 # 08 Y:1999 | 08 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $940 | $5,925 | Not Implemented |
MA0444 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,858 | $0 | Implemented |
MA0444 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $303 | $117 | Implemented |
MA0444 # 03 Y:1999 | 03 | 1999 | INSTALL OCCUPANCY SENSORS | $322 | $248 | Implemented |
MA0444 # 04 Y:1999 | 04 | 1999 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $879 | $4,225 | Not Implemented |
MA0444 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $114 | $470 | Not Implemented |
MA0444 # 06 Y:1999 | 06 | 1999 | $3,766 | $0 | Not Implemented | |
MA0432 # 08 Y:1999 | 08 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $428 | $200 | Implemented |
MA0432 # 09 Y:1999 | 09 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $321 | $30 | Implemented |
MA0432 # 07 Y:1999 | 07 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $681 | $0 | Implemented |
MA0432 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $703 | $1,451 | Implemented |
MA0432 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,201 | $18,690 | Implemented |