Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0523 # 06 Y:2002 | 06 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $467 | $250 | Implemented |
MA0523 # 05 Y:2002 | 05 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,423 | $2,200 | Not Implemented |
MA0523 # 04 Y:2002 | 04 | 2002 | $1,510 | $0 | Implemented | |
MA0523 # 03 Y:2002 | 03 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,108 | $0 | Implemented |
MA0523 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $6,907 | $11,770 | Implemented |
MA0523 # 01 Y:2002 | 01 | 2002 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $14,262 | $23,900 | Not Implemented |
MA0523 # 07 Y:2002 | 07 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $359 | $230 | Implemented |
MA0523 # 08 Y:2002 | 08 | 2002 | USE SYNTHETIC LUBRICANT | $308 | $0 | Not Implemented |
MA0517 # 02 Y:2002 | 02 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,697 | $33,800 | Not Implemented |
MA0517 # 01 Y:2002 | 01 | 2002 | COVER OPEN TANKS | $30,107 | $4,262 | Implemented |
MA0517 # 03 Y:2002 | 03 | 2002 | USE MINIMUM SAFE OVEN VENTILATION | $7,427 | $2,100 | Implemented |
MA0517 # 04 Y:2002 | 04 | 2002 | $6,528 | $0 | Implemented | |
MA0517 # 05 Y:2002 | 05 | 2002 | INSULATE BARE EQUIPMENT | $6,349 | $9,636 | Implemented |
MA0517 # 06 Y:2002 | 06 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,140 | $5,200 | Implemented |
MA0517 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,164 | $2,500 | Implemented |
MA0517 # 08 Y:2002 | 08 | 2002 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $853 | $1,515 | Implemented |
MA0506 # 03 Y:2002 | 03 | 2002 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $3,778 | $0 | Not Implemented |
MA0506 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,554 | $9,225 | Implemented |
MA0506 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $982 | $3,275 | Implemented |
MA0506 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,289 | $1,100 | Implemented |
MA0506 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,391 | $1,102 | Implemented |
MA0506 # 02 Y:2002 | 02 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,604 | $13,500 | Not Implemented |
MA0508 # 04 Y:2002 | 04 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,108 | $400 | Implemented |
MA0508 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,878 | $3,513 | Implemented |
MA0508 # 02 Y:2002 | 02 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,830 | $5,950 | Implemented |