Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
318
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0550 # 01 Y:2004 | 01 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $86,929 | $32,965 | Not Implemented |
MA0550 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,960 | $23,000 | Not Implemented |
MA0550 # 03 Y:2004 | 03 | 2004 | OPTIMIZE PLANT POWER FACTOR | $10,668 | $2,066 | Not Implemented |
MA0550 # 04 Y:2004 | 04 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $599 | $0 | Not Implemented |
MA0550 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $547 | $0 | Not Implemented |
MA0550 # 06 Y:2004 | 06 | 2004 | INSULATE BARE EQUIPMENT | $185 | $120 | Not Implemented |
MA0523 # 05 Y:2002 | 05 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,423 | $2,200 | Not Implemented |
MA0523 # 08 Y:2002 | 08 | 2002 | USE SYNTHETIC LUBRICANT | $308 | $0 | Not Implemented |
MA0523 # 07 Y:2002 | 07 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $359 | $230 | Implemented |
MA0523 # 06 Y:2002 | 06 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $467 | $250 | Implemented |
MA0523 # 04 Y:2002 | 04 | 2002 | $1,510 | $0 | Implemented | |
MA0523 # 03 Y:2002 | 03 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,108 | $0 | Implemented |
MA0523 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $6,907 | $11,770 | Implemented |
MA0523 # 01 Y:2002 | 01 | 2002 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $14,262 | $23,900 | Not Implemented |
MA0506 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,289 | $1,100 | Implemented |
MA0506 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,391 | $1,102 | Implemented |
MA0506 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,554 | $9,225 | Implemented |
MA0506 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $982 | $3,275 | Implemented |
MA0506 # 02 Y:2002 | 02 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,604 | $13,500 | Not Implemented |
MA0506 # 03 Y:2002 | 03 | 2002 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $3,778 | $0 | Not Implemented |
MA0508 # 05 Y:2002 | 05 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,586 | $0 | Implemented |
MA0508 # 01 Y:2002 | 01 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $29,135 | $0 | Implemented |
MA0508 # 02 Y:2002 | 02 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,830 | $5,950 | Implemented |
MA0508 # 04 Y:2002 | 04 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,108 | $400 | Implemented |
MA0508 # 06 Y:2002 | 06 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $842 | $1,000 | Not Implemented |