Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
318
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0431 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,159 | $7,290 | Not Implemented |
MA0431 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,860 | $0 | Implemented |
MA0431 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $642 | $2,137 | Implemented |
MA0390 # 06 Y:1997 | 06 | 1997 | CONVERT TO AQUEOUS CLEANING | $548 | $0 | Not Implemented |
MA0390 # 05 Y:1997 | 05 | 1997 | INSTALL OCCUPANCY SENSORS | $852 | $999 | Not Implemented |
MA0390 # 04 Y:1997 | 04 | 1997 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $3,585 | $480 | Not Implemented |
MA0390 # 03 Y:1997 | 03 | 1997 | OPTIMIZE PLANT POWER FACTOR | $4,435 | $9,975 | Not Implemented |
MA0390 # 02 Y:1997 | 02 | 1997 | $5,709 | $0 | Not Implemented | |
MA0390 # 01 Y:1997 | 01 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,319 | $11,700 | Not Implemented |
MA0391 # 05 Y:1997 | 05 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,783 | $4,225 | Not Implemented |
MA0391 # 04 Y:1997 | 04 | 1997 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $4,656 | $3,770 | Not Implemented |
MA0391 # 03 Y:1997 | 03 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,321 | $9,750 | Not Implemented |
MA0391 # 02 Y:1997 | 02 | 1997 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,846 | $900 | Not Implemented |
MA0391 # 01 Y:1997 | 01 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,296 | $791 | Not Implemented |
MA0391 # 07 Y:1997 | 07 | 1997 | INSTALL SET-BACK TIMERS | $10,158 | $30,560 | Not Implemented |
MA0391 # 06 Y:1997 | 06 | 1997 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $947 | $520 | Not Implemented |
MA0382 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,713 | $200 | Implemented |
MA0382 # 01 Y:1997 | 01 | 1997 | INSULATE BARE EQUIPMENT | $1,954 | $1,527 | Implemented |
MA0382 # 02 Y:1997 | 02 | 1997 | $2,296 | $5,000 | Implemented | |
MA0382 # 04 Y:1997 | 04 | 1997 | USE OTHER METHODS FOR NEUTRALIZATION | $457,830 | $754,000 | Not Implemented |
MA0382 # 05 Y:1997 | 05 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,752 | $13,700 | Not Implemented |
MA0382 # 03 Y:1997 | 03 | 1997 | USE SOY OR WATER-BASED INKS | $240,201 | $300,000 | Not Implemented |
MA0381 # 06 Y:1997 | 06 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,560 | $4,280 | Implemented |
MA0381 # 04 Y:1997 | 04 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,307 | $65,000 | Implemented |
MA0381 # 01 Y:1997 | 01 | 1997 | $62,985 | $16,000 | Implemented |