IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0640 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,895 $3,000 Implemented
MA0640 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $977 $0 Implemented
MA0640 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $644 $689 Implemented
MA0629 # 01 Y:2008 01 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,363 $2,800 Implemented
MA0629 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $1,935 $2,100 Not Implemented
MA0629 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,726 $6,800 Not Implemented
MA0629 # 04 Y:2008 04 2008 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $1,367 $3,000 Not Implemented
MA0629 # 05 Y:2008 05 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $450 $1,620 Implemented
MA0629 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $351 $400 Implemented
MA0629 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $247 $200 Implemented
MA0546 # 01 Y:2004 01 2004 INSTALL OCCUPANCY SENSORS $16,130 $4,480 Not Implemented
MA0546 # 02 Y:2004 02 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $13,348 $4,712 n/a
MA0546 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $11,157 $1,992 Not Implemented
MA0546 # 04 Y:2004 04 2004 REDUCE VENTILATION AIR $7,495 $1,200 Implemented
MA0546 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,827 $4,972 Implemented
MA0546 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,243 $3,230 Implemented
MA0546 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,839 $282 Not Implemented
MA0546 # 08 Y:2004 08 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $981 $720 Not Implemented
MA0546 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $3,000 Implemented
MA0507 # 01 Y:2002 01 2002 $69,744 $194,100 Implemented
MA0507 # 02 Y:2002 02 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,237 $40,000 Not Implemented
MA0507 # 03 Y:2002 03 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,940 $4,000 Not Implemented
MA0507 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,037 $35,500 Not Implemented
MA0507 # 05 Y:2002 05 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $795 $3,230 Implemented
MA0507 # 06 Y:2002 06 2002 $576 $0 Implemented