Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
104
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0477 # 01 Y:2000 | 01 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $22,890 | $2,000 | Not Implemented |
MA0477 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $410 | $500 | Implemented |
MA0477 # 02 Y:2000 | 02 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,290 | $103,000 | Not Implemented |
MA0477 # 03 Y:2000 | 03 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,580 | $21,000 | Not Implemented |
MA0477 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,200 | $11,700 | Implemented |
MA0477 # 04 Y:2000 | 04 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,910 | $0 | Not Implemented |
MA0476 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,100 | $24,000 | Implemented |
MA0476 # 09 Y:2000 | 09 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,790 | $0 | Implemented |
MA0476 # 08 Y:2000 | 08 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,760 | $7,500 | Implemented |
MA0476 # 07 Y:2000 | 07 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,150 | $5,000 | Implemented |
MA0476 # 10 Y:2000 | 10 | 2000 | ISOLATE HOT OR COLD EQUIPMENT | $2,280 | $0 | Implemented |
MA0476 # 01 Y:2000 | 01 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $109,000 | $720,000 | Not Implemented |
MA0476 # 05 Y:2000 | 05 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,020 | $35,000 | Not Implemented |
MA0476 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,130 | $1,000 | Implemented |
MA0476 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,750 | $50,000 | Not Implemented |
MA0476 # 11 Y:2000 | 11 | 2000 | REPAIR AND ELIMINATE STEAM LEAKS | $950 | $500 | Implemented |
MA0476 # 06 Y:2000 | 06 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,840 | $40,000 | Not Implemented |
MA0475 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $970 | $150 | Implemented |
MA0475 # 08 Y:2000 | 08 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $130 | $0 | Implemented |
MA0475 # 02 Y:2000 | 02 | 2000 | OPTIMIZE PLANT POWER FACTOR | $2,450 | $5,700 | Implemented |
MA0475 # 04 Y:2000 | 04 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,950 | $0 | Implemented |
MA0475 # 06 Y:2000 | 06 | 2000 | PAY BILLS ON TIME TO AVOID LATE FEES | $519 | $0 | Implemented |
MA0475 # 03 Y:2000 | 03 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $2,000 | $2,400 | Implemented |
MA0475 # 07 Y:2000 | 07 | 2000 | INSTALL OCCUPANCY SENSORS | $220 | $500 | Not Implemented |
MA0475 # 01 Y:2000 | 01 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,500 | $8,500 | Not Implemented |