Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,699
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0544 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $543 | $20 | Implemented |
MA0544 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,425 | $2,000 | Not Implemented |
MA0544 # 01 Y:2003 | 01 | 2003 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $3,663 | $2,000 | Implemented |
MA0544 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,646 | $6,156 | Implemented |
MA0544 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $1,236 | $600 | Not Implemented |
MA0538 # 04 Y:2003 | 04 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,650 | $60,800 | Implemented |
MA0538 # 01 Y:2003 | 01 | 2003 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $141,119 | $1,825,320 | Not Implemented |
MA0538 # 07 Y:2003 | 07 | 2003 | OPTIMIZE PLANT POWER FACTOR | $10,424 | $31,667 | Not Implemented |
MA0538 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,238 | $85 | Implemented |
MA0538 # 03 Y:2003 | 03 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $31,418 | $1,200 | Implemented |
MA0538 # 02 Y:2003 | 02 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $33,322 | $76,300 | Not Implemented |
MA0538 # 06 Y:2003 | 06 | 2003 | USE RADIANT HEATER FOR SPOT HEATING | $10,594 | $44,750 | Not Implemented |
MA0538 # 05 Y:2003 | 05 | 2003 | COVER OPEN TANKS | $12,160 | $39,000 | Not Implemented |
MA0533 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,098 | $1,090 | Implemented |
MA0533 # 01 Y:2003 | 01 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $27,237 | $1,300 | Not Implemented |
MA0533 # 03 Y:2003 | 03 | 2003 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $10,803 | $25,625 | Implemented |
MA0533 # 04 Y:2003 | 04 | 2003 | ADD AREA LIGHTING SWITCHES | $8,645 | $3,215 | Implemented |
MA0533 # 06 Y:2003 | 06 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,624 | $6,120 | Implemented |
MA0533 # 02 Y:2003 | 02 | 2003 | REDUCE VENTILATION AIR | $16,298 | $34,450 | Not Implemented |
MA0533 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,140 | $15,455 | Implemented |
MA0532 # 06 Y:2003 | 06 | 2003 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,627 | $1,845 | Implemented |
MA0532 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $67,039 | $7,300 | Implemented |
MA0532 # 08 Y:2003 | 08 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $520 | $0 | Not Implemented |
MA0532 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,606 | $4,400 | Implemented |
MA0532 # 02 Y:2003 | 02 | 2003 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $38,956 | $84,895 | Not Implemented |