Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
81
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0585 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,480 | $78,770 | Implemented |
MA0585 # 05 Y:2005 | 05 | 2005 | USE MINIMUM STEAM OPERATING PRESSURE | $29,239 | $23,014 | Implemented |
MA0585 # 07 Y:2005 | 07 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,353 | $9,225 | Implemented |
MA0585 # 01 Y:2005 | 01 | 2005 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $112,569 | $254,000 | Not Implemented |
MA0585 # 08 Y:2005 | 08 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,385 | $5,300 | Implemented |
MA0585 # 09 Y:2005 | 09 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,037 | $5,300 | Implemented |
MA0585 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $73,100 | $37,300 | Implemented |
MA0585 # 02 Y:2005 | 02 | 2005 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $91,755 | $254,400 | Not Implemented |
MA0585 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,416 | $37,300 | Implemented |
MA0583 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $105 | $296 | Implemented |
MA0583 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $826 | $0 | Implemented |
MA0583 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $79 | $318 | Implemented |
MA0583 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $228 | $0 | Implemented |
MA0583 # 04 Y:2005 | 04 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,148 | $0 | Implemented |
MA0583 # 02 Y:2005 | 02 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,360 | $1,180 | Implemented |
MA0583 # 03 Y:2005 | 03 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,215 | $0 | Implemented |
MA0583 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,565 | $29,567 | Implemented |
MA0587 # 01 Y:2005 | 01 | 2005 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $32,448 | $600 | Not Implemented |
MA0587 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $392 | $900 | Implemented |
MA0587 # 05 Y:2005 | 05 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $580 | $452 | Not Implemented |
MA0587 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $1,022 | $1,520 | Not Implemented |
MA0587 # 02 Y:2005 | 02 | 2005 | COMBINE UTILITY METERS | $4,300 | $15,675 | Implemented |
MA0587 # 03 Y:2005 | 03 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $875 | $1,210 | Implemented |
MA0584 # 03 Y:2005 | 03 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $3,727 | $11,326 | Not Implemented |
MA0584 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,880 | $2,800 | Implemented |