IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0585 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,480 $78,770 Implemented
MA0585 # 05 Y:2005 05 2005 USE MINIMUM STEAM OPERATING PRESSURE $29,239 $23,014 Implemented
MA0585 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,353 $9,225 Implemented
MA0585 # 01 Y:2005 01 2005 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $112,569 $254,000 Not Implemented
MA0585 # 08 Y:2005 08 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,385 $5,300 Implemented
MA0585 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,037 $5,300 Implemented
MA0585 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,100 $37,300 Implemented
MA0585 # 02 Y:2005 02 2005 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $91,755 $254,400 Not Implemented
MA0585 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,416 $37,300 Implemented
MA0583 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $105 $296 Implemented
MA0583 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $826 $0 Implemented
MA0583 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $79 $318 Implemented
MA0583 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $228 $0 Implemented
MA0583 # 04 Y:2005 04 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,148 $0 Implemented
MA0583 # 02 Y:2005 02 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,360 $1,180 Implemented
MA0583 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $4,215 $0 Implemented
MA0583 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,565 $29,567 Implemented
MA0587 # 01 Y:2005 01 2005 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $32,448 $600 Not Implemented
MA0587 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $392 $900 Implemented
MA0587 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $580 $452 Not Implemented
MA0587 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $1,022 $1,520 Not Implemented
MA0587 # 02 Y:2005 02 2005 COMBINE UTILITY METERS $4,300 $15,675 Implemented
MA0587 # 03 Y:2005 03 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $875 $1,210 Implemented
MA0584 # 03 Y:2005 03 2005 USE RADIANT HEATER FOR SPOT HEATING $3,727 $11,326 Not Implemented
MA0584 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,880 $2,800 Implemented