Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0666 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,085 | $8,685 | Not Implemented |
MA0666 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,146 | $5,990 | Not Implemented |
MA0666 # 04 Y:2010 | 04 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $550 | $200 | Not Implemented |
MA0666 # 03 Y:2010 | 03 | 2010 | ADD AREA LIGHTING SWITCHES | $1,900 | $500 | Implemented |
MA0664 # 03 Y:2010 | 03 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $25,051 | $34,000 | Not Implemented |
MA0664 # 02 Y:2010 | 02 | 2010 | MINIMIZE WATER USAGE | $26,438 | $62,000 | Not Implemented |
MA0664 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,084 | $200 | Implemented |
MA0664 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,874 | $18,345 | Not Implemented |
MA0664 # 04 Y:2010 | 04 | 2010 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $17,890 | $95,000 | Not Implemented |
MA0664 # 01 Y:2010 | 01 | 2010 | OPTIMIZE PLANT POWER FACTOR | $133,570 | $55,950 | Implemented |
MA0663 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $938 | $600 | Implemented |
MA0663 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $900 | $200 | Not Implemented |
MA0663 # 03 Y:2010 | 03 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,990 | $21,410 | Not Implemented |
MA0663 # 02 Y:2010 | 02 | 2010 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $10,239 | $24,000 | Not Implemented |
MA0663 # 01 Y:2010 | 01 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,896 | $90,000 | Not Implemented |
MA0662 # 03 Y:2010 | 03 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,305 | $4,995 | Not Implemented |
MA0662 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,395 | $2,265 | Implemented |
MA0662 # 02 Y:2010 | 02 | 2010 | REDUCE VENTILATION AIR | $2,158 | $3,935 | Implemented |
MA0662 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $883 | $1,500 | Implemented |
MA0662 # 04 Y:2010 | 04 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,287 | $5,324 | Not Implemented |
MA0662 # 08 Y:2010 | 08 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $644 | $640 | Implemented |
MA0662 # 05 Y:2010 | 05 | 2010 | INSULATE BARE EQUIPMENT | $1,011 | $1,760 | Implemented |
MA0662 # 07 Y:2010 | 07 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $680 | $2,000 | Implemented |
MA0662 # 09 Y:2010 | 09 | 2010 | INSTALL OCCUPANCY SENSORS | $547 | $1,740 | Implemented |
MA0661 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $232 | $260 | Implemented |