IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0362 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,026 $14,436 Implemented
MA0362 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $1,613 $280 Not Implemented
MA0362 # 08 Y:1996 08 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $878 $902 Not Implemented
MA0361 # 01 Y:1996 01 1996 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,187 $2,640 Implemented
MA0361 # 02 Y:1996 02 1996 REPAIR OR REPLACE STEAM TRAPS $5,482 $3,408 Implemented
MA0361 # 03 Y:1996 03 1996 USE EVAPORATION TO CONCENTRATE MATERIAL $5,695 $295 Not Implemented
MA0361 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,759 $1,400 Implemented
MA0361 # 05 Y:1996 05 1996 INSTALL TIMERS AND/OR THERMOSTATS $5,189 $4,200 Implemented
MA0361 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $764 $2,493 Not Implemented
MA0361 # 07 Y:1996 07 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $432 $0 Implemented
MA0361 # 08 Y:1996 08 1996 REUSE / RECYCLE/ SELL PAPER PRODUCTS $304 $79 Implemented
MA0356 # 01 Y:1996 01 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $29,400 $118,450 Implemented
MA0356 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,644 $3,000 Implemented
MA0356 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,838 $0 Implemented
MA0356 # 04 Y:1996 04 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,672 $10,000 Not Implemented
MA0356 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $448 $0 Not Implemented
MA0354 # 01 Y:1996 01 1996 USE RADIANT HEATER FOR SPOT HEATING $23,668 $72,000 Implemented
MA0354 # 02 Y:1996 02 1996 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $2,604 $5,000 Not Implemented
MA0354 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $2,340 $4,335 Not Implemented
MA0354 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $613 $200 Implemented
MA0354 # 05 Y:1996 05 1996 REUSE / RECYCLE/ SELL PAPER PRODUCTS $495 $0 Not Implemented
MA0354 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $472 $770 Not Implemented
MA0354 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $312 Not Implemented