IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0507 # 01 Y:2002 01 2002 $69,744 $194,100 Implemented
MA0507 # 03 Y:2002 03 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,940 $4,000 Not Implemented
MA0507 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,037 $35,500 Not Implemented
MA0507 # 05 Y:2002 05 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $795 $3,230 Implemented
MA0507 # 07 Y:2002 07 2002 USE POWER DURING OFF-PEAK PERIODS $567 $500 Not Implemented
MA0507 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $213 $0 Implemented
MA0507 # 02 Y:2002 02 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,237 $40,000 Not Implemented
MA0505 # 04 Y:2002 04 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $13,130 $25,484 Not Implemented
MA0505 # 01 Y:2002 01 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $55,391 $74,250 Not Implemented
MA0505 # 02 Y:2002 02 2002 REPLACE TREATED WATER WITH WELL / SURFACE WATER $37,920 $18,500 Not Implemented
MA0505 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,893 $55,300 Not Implemented
MA0505 # 05 Y:2002 05 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,441 $5,848 Not Implemented
MA0505 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,523 $2,000 Not Implemented
MA0504 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,658 $80,500 Implemented
MA0504 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,196 $0 Implemented
MA0504 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,901 $7,000 Implemented
MA0504 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,155 $13,100 Not Implemented
MA0504 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,725 $46,000 Not Implemented
MA0504 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $24,477 $22,000 Implemented
MA0504 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $117,765 $284,800 Not Implemented