IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0446 # 13 Y:2012 13 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $2,788 $1,351 Not Implemented
WV0446 # 12 Y:2012 12 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,862 $1,070 Implemented
WV0446 # 11 Y:2012 11 2012 REPAIR OR REPLACE STEAM TRAPS $3,610 $4,438 Implemented
WV0446 # 10 Y:2012 10 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,393 $423 Not Implemented
WV0446 # 09 Y:2012 09 2012 DEVELOP A REPAIR/REPLACE POLICY $6,712 $5,683 Implemented
WV0446 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,963 $2,500 Implemented
WV0446 # 07 Y:2012 07 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,197 $32,125 Not Implemented
WV0446 # 06 Y:2012 06 2012 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $9,842 $9,500 Not Implemented
WV0446 # 05 Y:2012 05 2012 IMPROVE LUBRICATION PRACTICES $10,748 $2,034 Not Implemented
WV0446 # 04 Y:2012 04 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $16,273 $1,000 Implemented
WV0446 # 02 Y:2012 02 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,144 $70,000 Not Implemented
WV0446 # 01 Y:2012 01 2012 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $147,469 $548,000 Not Implemented
DL0066 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,015 $4,000 Implemented
DL0066 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,960 $1,035 Implemented
DL0066 # 03 Y:2011 03 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,460 $2,000 Implemented
DL0066 # 02 Y:2011 02 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $101,455 $36,300 Not Implemented
DL0066 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,163 $3,750 Not Implemented
DL0066 # 06 Y:2011 06 2011 UPGRADE CONTROLS ON COMPRESSORS $12,600 $10,000 Not Implemented
DL0066 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,701 $1,257 Not Implemented
DL0029 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,700 $3,250 Not Implemented
DL0029 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,724 $75,600 Not Implemented
DL0029 # 03 Y:2008 03 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $44,793 $11,000 Implemented
DL0029 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,326 $4,000 Implemented
DL0029 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,200 $500 Not Implemented
WV0328 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $0 Implemented