IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0141 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,730 $43,955 Not Implemented
DL0141 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,965 $960 Implemented
DL0141 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,730 $8,640 Implemented
DL0141 # 01 Y:2015 01 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,650 $5,120 Implemented
DL0114 # 09 Y:2013 09 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $41,139 $70,800 Not Implemented
DL0114 # 08 Y:2013 08 2013 USE PHOTOCELL CONTROLS $100 $85 Not Implemented
DL0114 # 07 Y:2013 07 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $10,394 $7,600 Not Implemented
DL0114 # 06 Y:2013 06 2013 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $27,486 $11,000 Not Implemented
DL0114 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,930 $2,000 Not Implemented
DL0114 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,080 $500 Not Implemented
DL0114 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,278 $2,350 Not Implemented
DL0114 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,410 $2,000 Not Implemented
DL0114 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $12,684 $2,350 Not Implemented
DL0093 # 01 Y:2012 01 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,140 $100 Implemented
DL0093 # 02 Y:2012 02 2012 USE RADIANT HEATER FOR SPOT HEATING $2,870 $818 Not Implemented
DL0093 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,360 $50 Not Implemented
DL0093 # 04 Y:2012 04 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,680 $5,000 Not Implemented
DL0093 # 05 Y:2012 05 2012 REDUCE VENTILATION AIR $1,102 $600 Not Implemented
DL0093 # 06 Y:2012 06 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $940 $230 Not Implemented
DL0093 # 07 Y:2012 07 2012 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $360 $20 Not Implemented
DL0093 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $974 $480 Implemented
DL0093 # 09 Y:2012 09 2012 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $480 $425 Not Implemented
DL0086 # 11 Y:2012 11 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $493 $450 Not Implemented
DL0086 # 12 Y:2012 12 2012 RECOVER WASTE HEAT FROM EQUIPMENT $8,850 $10,000 Not Implemented
DL0086 # 13 Y:2012 13 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,800 $9,700 Not Implemented