IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

992

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0154 # 07 Y:1998 07 1998 RECOVER AND REUSE COOLING WATER $670 $1,525 Not Implemented
WV0154 # 08 Y:1998 08 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,940 $550 Not Implemented
WV0154 # 09 Y:1998 09 1998 $180,000 $4,000 Not Implemented
OD0113 # 01 Y:1998 01 1998 ELIMINATE/REDUCE AN OPERATION $22,713 $0 Not Implemented
OD0113 # 02 Y:1998 02 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $15,720 $21,621 Implemented
OD0113 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,820 $1,091 Implemented
OD0113 # 04 Y:1998 04 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $209 $250 Not Implemented
OD0113 # 05 Y:1998 05 1998 REDUCE VENTILATION AIR $1,897 $0 Not Implemented
OD0113 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,794 $14,284 Implemented
OD0113 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $9,036 $50,000 Implemented
WV0138 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $564 $2,195 Implemented
WV0138 # 02 Y:1998 02 1998 USE SYNTHETIC LUBRICANT $343 $254 Implemented
WV0138 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $865 $324 Not Implemented
WV0138 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $186 $112 Not Implemented
WV0138 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $240 Implemented
WV0138 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $900 $3,830 Implemented
WV0138 # 07 Y:1998 07 1998 INSULATE BARE EQUIPMENT $4,520 $380 Not Implemented
WV0138 # 08 Y:1998 08 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,724 $0 Implemented
WV0138 # 09 Y:1998 09 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,429 $0 Implemented
WV0138 # 10 Y:1998 10 1998 $57,600 $272 Not Implemented
OD0084 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,338 $25,270 Not Implemented
OD0084 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $818 $589 Implemented
OD0084 # 03 Y:1997 03 1997 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,617 $4,378 Not Implemented
OD0084 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,487 $1,724 Implemented
OD0084 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,624 $1,495 Implemented