Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
62
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0177 # 01 Y:2017 | 01 | 2017 | OPERATE BOILERS ON HIGH FIRE SETTING | $16,174 | $28,750 | Not Implemented |
DL0177 # 02 Y:2017 | 02 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $10,881 | $2,032 | Not Implemented |
DL0177 # 03 Y:2017 | 03 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $12,079 | $3,000 | Not Implemented |
DL0177 # 04 Y:2017 | 04 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $39,860 | $40,000 | Not Implemented |
WV0547 # 12 Y:2017 | 12 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $102 | $348 | Not Implemented |
WV0547 # 01 Y:2017 | 01 | 2017 | INSULATE BARE EQUIPMENT | $15,992 | $5,658 | Implemented |
WV0547 # 02 Y:2017 | 02 | 2017 | IMPROVE COMBUSTION CONTROL CAPABILITY | $7,947 | $25,500 | Not Implemented |
WV0547 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,491 | $9,434 | Implemented |
WV0547 # 04 Y:2017 | 04 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,796 | $1,263 | Not Implemented |
WV0547 # 05 Y:2017 | 05 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,360 | $2,700 | Not Implemented |
WV0547 # 06 Y:2017 | 06 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $970 | $4,600 | Implemented |
WV0547 # 07 Y:2017 | 07 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $563 | $700 | Not Implemented |
WV0547 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $412 | $2,050 | Implemented |
WV0547 # 09 Y:2017 | 09 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $243 | $1,000 | Implemented |
WV0547 # 10 Y:2017 | 10 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $175 | $850 | Implemented |
WV0547 # 11 Y:2017 | 11 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $133 | $25 | Not Implemented |
DL0173 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,435 | $15,000 | Implemented |
DL0173 # 01 Y:2017 | 01 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $20,880 | $0 | Implemented |
DL0173 # 07 Y:2017 | 07 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,800 | $3,940 | Not Implemented |
DL0173 # 06 Y:2017 | 06 | 2017 | UPGRADE OBSOLETE EQUIPMENT | $17,600 | $5,950 | Implemented |
DL0173 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,364 | $654 | Not Implemented |
DL0173 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,100 | $9,375 | Not Implemented |
DL0173 # 04 Y:2017 | 04 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,676 | $1,375 | Implemented |
WV0540 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,287 | $713 | Implemented |
WV0540 # 06 Y:2017 | 06 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $1,394 | $635 | Implemented |