ID Products Savings Cost
MA0739 # 07 Y:2015 PAY UTILITY BILLS ON TIME $426 $500
MA0739 # 06 Y:2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $475 $915
MA0739 # 05 Y:2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $864 $2,635
MA0739 # 04 Y:2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $880 $1,285
MA0739 # 03 Y:2015 INSTALL / REPAIR INSULATION ON STEAM LINES $927 $1,570
MA0739 # 01 Y:2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,369 $11,834
MA0739 # 02 Y:2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,543 $500
MA0723 # 05 Y:2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,158 $1,250
MA0723 # 04 Y:2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,047 $32,000
MA0723 # 03 Y:2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,628 $5,000
MA0723 # 01 Y:2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,304 $90,000
MA0723 # 02 Y:2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $20,745 $110,500
MA0607 # 07 Y:2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,860 $3,500
MA0607 # 06 Y:2006 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,577 $1,870
MA0607 # 05 Y:2006 USE UTILITY CONTROLLED POWER MANAGEMENT $12,223 $14,000