IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

189

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0306 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,558 $197 Implemented
UM0261 # 01 Y:2004 01 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $96,676 $11,096 Not Implemented
UM0261 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,377 $47,700 Not Implemented
UM0261 # 03 Y:2004 03 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,493 $2,000 Implemented
UM0261 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $6,503 $500 Implemented
UM0261 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,770 $1,711 Implemented
UM0261 # 06 Y:2004 06 2004 COVER OPEN TANKS $625 $300 Implemented
UM0254 # 01 Y:2004 01 2004 $31,255 $30,000 Not Implemented
UM0254 # 02 Y:2004 02 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,650 $2,200 Implemented
UM0254 # 03 Y:2004 03 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,907 $0 Implemented
UM0254 # 04 Y:2004 04 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,584 $15,000 Not Implemented
UM0254 # 05 Y:2004 05 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,267 $10,000 Not Implemented
UM0254 # 06 Y:2004 06 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,010 $1,080 Implemented
UM0254 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,479 $1,038 Implemented
UM0243 # 01 Y:2003 01 2003 $142,452 $31,500 Implemented
UM0243 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $20,715 $4,565 Not Implemented
UM0243 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $24,928 $520 Implemented
UM0243 # 04 Y:2003 04 2003 AIR CONDITION ONLY SPACE NECESSARY $13,955 $6,000 Implemented
UM0243 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,857 $150 Implemented
UM0243 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,082 $100 Not Implemented
UM0207 # 01 Y:2002 01 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $119,000 $180,000 Not Implemented
UM0207 # 02 Y:2002 02 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,811 $3,150 Not Implemented
UM0207 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,268 $5,045 Not Implemented
UM0207 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,977 $1,000 Not Implemented
UM0207 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,710 $450 Implemented