Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
198
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0044 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $506 | $138 | n/a |
MU0044 # 05 Y:2024 | 05 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $48 | $0 | n/a |
MU0044 # 04 Y:2024 | 04 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $330 | $0 | n/a |
MU0044 # 03 Y:2024 | 03 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $275 | $720 | n/a |
MU0044 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $493 | $160 | n/a |
MU0044 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,504 | $21,472 | n/a |
MU0044 # 12 Y:2024 | 12 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,256 | $158,490 | n/a |
MU0044 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,007 | $593 | n/a |
MU0044 # 09 Y:2024 | 09 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $362 | $0 | n/a |
MU0044 # 08 Y:2024 | 08 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,101 | $34,200 | n/a |
MU0044 # 10 Y:2024 | 10 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,537 | $3,386 | n/a |
MU0044 # 11 Y:2024 | 11 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $158 | $617 | n/a |
MU0042 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,500 | $340 | n/a |
MU0042 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,930 | $4,000 | n/a |
MU0042 # 03 Y:2023 | 03 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $574 | $0 | n/a |
MU0042 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $272 | $69 | n/a |
MU0042 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,317 | $16,978 | n/a |
MU0042 # 06 Y:2023 | 06 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $31,190 | $89,468 | n/a |
MU0042 # 07 Y:2023 | 07 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,365 | $25,500 | n/a |
CW0114 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $1,244 | $110 | Not Implemented |
CW0114 # 08 Y:2020 | 08 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,024 | $10,137 | Not Implemented |
CW0114 # 06 Y:2020 | 06 | 2020 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,504 | $0 | Implemented |
CW0114 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,314 | $4,006 | Not Implemented |
CW0114 # 03 Y:2020 | 03 | 2020 | INSTALL SKYLIGHTS | $8,290 | $40,875 | Not Implemented |
CW0114 # 02 Y:2020 | 02 | 2020 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $10,400 | $0 | Implemented |