Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
14
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0218 # 01 Y:2002 | 01 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,191 | $200 | Implemented |
UM0218 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,305 | $900 | Implemented |
UM0218 # 06 Y:2002 | 06 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,551 | $3,000 | Implemented |
UM0218 # 07 Y:2002 | 07 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,604 | $2,500 | Implemented |
UM0218 # 08 Y:2002 | 08 | 2002 | INSULATE BARE EQUIPMENT | $2,470 | $800 | Implemented |
UM0218 # 10 Y:2002 | 10 | 2002 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,185 | $100 | Implemented |
UM0205 # 01 Y:2002 | 01 | 2002 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $18,000 | $5,940 | Implemented |
UM0205 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,300 | $15,000 | Implemented |
UM0205 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,362 | $300 | Implemented |
UM0205 # 06 Y:2002 | 06 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $932 | $1,000 | Implemented |
UM0204 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $2,700 | $4,970 | Implemented |
UM0204 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,220 | $1,220 | Implemented |
UM0204 # 04 Y:2002 | 04 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,160 | $500 | Implemented |
UM0204 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $375 | Implemented |