Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
97
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0437 # 08 Y:2013 | 08 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,177 | $4,660 | Not Implemented |
UM0437 # 09 Y:2013 | 09 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,800 | $1,500 | Not Implemented |
UM0437 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,400 | $10,000 | Not Implemented |
UM0437 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $11,350 | $4,000 | Implemented |
UM0437 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,430 | $510 | Implemented |
UM0437 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,400 | $200 | Not Implemented |
UM0437 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,700 | $5,700 | Implemented |
UM0437 # 04 Y:2013 | 04 | 2013 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $11,900 | $5,000 | Not Implemented |
UM0437 # 05 Y:2013 | 05 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,000 | $2,500 | Not Implemented |
UM0436 # 01 Y:2013 | 01 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,924 | $2,500 | Implemented |
UM0436 # 02 Y:2013 | 02 | 2013 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $24,443 | $12,800 | Not Implemented |
UM0435 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,500 | $200 | Not Implemented |
UM0435 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,000 | $3,000 | Implemented |
UM0435 # 01 Y:2013 | 01 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,450 | $4,500 | Implemented |
UM0435 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $966 | $2,500 | Implemented |
UM0434 # 03 Y:2013 | 03 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,121 | $16,500 | Implemented |
UM0434 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $3,479 | $4,000 | Not Implemented |
UM0434 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,445 | $8,750 | Not Implemented |
UM0434 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,318 | $2,500 | Implemented |
UM0434 # 01 Y:2013 | 01 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,289 | $500 | Not Implemented |
UM0434 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,027 | $200 | Not Implemented |
UM0434 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,543 | $17,630 | Implemented |
UD0891 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $641 | $300 | Not Implemented |
UD0891 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,992 | $27,380 | Not Implemented |
UD0891 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,643 | $30,000 | Not Implemented |