IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0249 # 01 Y:2004 01 2004 MAINTAIN MACHINES TO REDUCE LEAKS $78,906 $4,500 Implemented
UM0249 # 02 Y:2004 02 2004 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $59,835 $55,000 Not Implemented
UM0249 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,288 $20,400 Implemented
UM0249 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,027 $8,138 Implemented
UM0249 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $6,174 $27,270 Implemented
UM0249 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,436 $975 Implemented
UM0247 # 01 Y:2004 01 2004 USE RADIANT HEATER FOR SPOT HEATING $300,078 $269,346 Not Implemented
UM0247 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,882 $7,500 Implemented
UM0247 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,365 $6,000 Not Implemented
UM0247 # 04 Y:2004 04 2004 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $10,227 $11,000 Not Implemented
UM0247 # 05 Y:2004 05 2004 UPGRADE CONTROLS ON COMPRESSORS $6,051 $12,000 Not Implemented
UM0247 # 06 Y:2004 06 2004 INSTALL COMMON HEADER ON COMPRESSORS $1,888 $1,100 Implemented
UM0246 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,080 $26,630 Not Implemented
UM0246 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $6,140 $700 Implemented
UM0246 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,885 $100 Implemented
UM0246 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,380 $500 Implemented
UM0246 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,165 $2,000 Not Implemented
UM0246 # 06 Y:2004 06 2004 ADD AREA LIGHTING SWITCHES $620 $600 Not Implemented
UM0245 # 01 Y:2004 01 2004 REDUCE SCRAP PRODUCTION $21,060 $2,288 Not Implemented
UM0245 # 02 Y:2004 02 2004 REPLACE BOILER $13,000 $34,000 Not Implemented
UM0245 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $7,445 $3,985 Not Implemented
UM0245 # 04 Y:2004 04 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,060 $12,288 Implemented
UM0245 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,670 $500 Not Implemented
UM0245 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,500 $7,700 Not Implemented
UM0245 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $225 Implemented