Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,727
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0376 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,296 | $7,200 | n/a |
MZ0376 # 03 Y:2025 | 03 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,548 | $54,000 | n/a |
MZ0376 # 08 Y:2025 | 08 | 2025 | REDUCE VENTILATION AIR | $3,456 | $6,974 | n/a |
MZ0376 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $4,145 | $1,560 | n/a |
MZ0376 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $86,491 | $702,000 | n/a |
MZ0376 # 02 Y:2025 | 02 | 2025 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $916 | $365 | n/a |
MZ0376 # 06 Y:2025 | 06 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,289 | $14,380 | n/a |
MZ0376 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,889 | $18,327 | n/a |
MZ0377 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $769 | $200 | n/a |
MZ0377 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $26,142 | $43,500 | n/a |
MZ0377 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,928 | $9,400 | n/a |
MZ0377 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,503 | $3,660 | n/a |
MZ0377 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $498 | $415 | n/a |
MZ0377 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $871 | $0 | n/a |
MZ0377 # 07 Y:2025 | 07 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $31,698 | $9,040 | n/a |
MZ0377 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,340 | $2,300 | n/a |
MZ0375 # 08 Y:2025 | 08 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,435 | $12,750 | n/a |
MZ0375 # 01 Y:2025 | 01 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,447 | $22,100 | n/a |
MZ0375 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,746 | $214,502 | n/a |
MZ0375 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $295 | $2,100 | n/a |
MZ0375 # 03 Y:2025 | 03 | 2025 | USE PHOTOCELL CONTROLS | $1,090 | $1,405 | n/a |
MZ0375 # 09 Y:2025 | 09 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $394,334 | $2,410,000 | n/a |
MZ0375 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,208 | $400 | n/a |
MZ0375 # 06 Y:2025 | 06 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,865 | $0 | n/a |
MZ0375 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,542 | $13,100 | n/a |