IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

132

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0258 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,883 $6,200 Not Implemented
MZ0258 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,344 $1,800 Implemented
MZ0258 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,199 $420 Not Implemented
MZ0258 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,450 $5,000 Implemented
MZ0258 # 07 Y:2018 07 2018 USE OPTIMUM THICKNESS INSULATION $4,597 $2,989 Not Implemented
MZ0258 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $19,136 $1,400 Not Implemented
MZ0228 # 06 Y:2017 06 2017 USE OPTIMUM THICKNESS INSULATION $625 $651 Not Implemented
MZ0228 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $897 $340 Implemented
MZ0228 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,423 $280 Implemented
MZ0228 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $1,772 Implemented
MZ0228 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,002 $1,080 Implemented
MZ0228 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $20,062 $0 Implemented
MZ0159 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,788 $23,000 Implemented
MZ0159 # 01 Y:2014 01 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $51,046 $118,500 Not Implemented
MZ0159 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $428 $1,200 Implemented
MZ0159 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $1,973 $1,599 Implemented
MZ0159 # 04 Y:2014 04 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $12,895 $37,500 Implemented
MZ0159 # 06 Y:2014 06 2014 USE PHOTOCELL CONTROLS $5,170 $1,000 Not Implemented
MZ0149 # 03 Y:2014 03 2014 LOWER CEILING TO REDUCE CONDITIONED SPACE $9,091 $25,000 Not Implemented
MZ0149 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $18,116 $16,400 Implemented
MZ0149 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $4,128 $6,040 Implemented
MZ0149 # 04 Y:2014 04 2014 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,580 $25,750 Not Implemented
MZ0149 # 06 Y:2014 06 2014 AIR CONDITION ONLY SPACE NECESSARY $46,961 $5,500 Not Implemented
MZ0149 # 05 Y:2014 05 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $14,550 $28,000 Not Implemented
MZ0146 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $12,828 $3,375 Not Implemented