IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

233

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0308 # 09 Y:1990 09 1990 INSULATE BARE EQUIPMENT $246 $165 Implemented
KU0308 # 10 Y:1990 10 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,139 $1,600 Implemented
KU0273 # 01 Y:1989 01 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $25,620 $38,400 Implemented
KU0273 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,343 $1,400 Implemented
KU0273 # 03 Y:1989 03 1989 INSTALL TURBULATORS $5,599 $5,760 Implemented
KU0273 # 04 Y:1989 04 1989 KEEP BOILER TUBES CLEAN $3,005 $1,500 Implemented
KU0273 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,859 $2,558 Implemented
KU0268 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,528 $8,010 Implemented
KU0268 # 02 Y:1988 02 1988 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,098 $500 Implemented
KU0268 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $153 $0 Implemented
KU0268 # 07 Y:1988 07 1988 IMPROVE LUBRICATION PRACTICES $153 $0 Implemented
KU0268 # 08 Y:1988 08 1988 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,598 $28 Implemented
KU0237 # 04 Y:1987 04 1987 RECOVER WASTE HEAT FROM EQUIPMENT $407 $250 Implemented
KU0237 # 06 Y:1987 06 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,203 $200 Implemented
KU0237 # 08 Y:1987 08 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $519 $0 Implemented
KU0237 # 10 Y:1987 10 1987 INSTALL TIMERS AND/OR THERMOSTATS $3,307 $157 Implemented
KU0186 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $4,780 $800 Implemented
KU0186 # 04 Y:1986 04 1986 INSULATE BARE EQUIPMENT $1,657 $1,500 Implemented
KU0186 # 05 Y:1986 05 1986 INSTALL AUTOMATIC STACK DAMPER $896 $725 Implemented
KU0186 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $360 $0 Implemented
KU0186 # 07 Y:1986 07 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $406 $0 Implemented
KU0186 # 08 Y:1986 08 1986 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $396 $385 Implemented
KU0186 # 10 Y:1986 10 1986 USE OPTIMUM TEMPERATURE $205 $0 Implemented
KU0186 # 11 Y:1986 11 1986 INSULATE BARE EQUIPMENT $187 $172 Implemented
KU0186 # 12 Y:1986 12 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $177 $30 Implemented