IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

402

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0303 # 07 Y:2021 07 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,124 $4,744 Implemented
MZ0302 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,817 $55,992 Implemented
MZ0302 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,015 $4,700 Implemented
MZ0302 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $217 $45 Implemented
NL0053 # 02 Y:2020 02 2020 KEEP EQUIPMENT CLEAN $24,724 $8,528 Implemented
NL0053 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,013 $1,500 Implemented
NL0053 # 08 Y:2020 08 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,080 $56 Implemented
NL0053 # 05 Y:2020 05 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,360 $56 Implemented
NL0053 # 04 Y:2020 04 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,704 $12,000 Implemented
NL0053 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,267 $4,456 Implemented
MZ0293 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $230 $780 Implemented
MZ0293 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,246 $6,782 Implemented
MZ0293 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,924 $910 Implemented
MZ0293 # 08 Y:2020 08 2020 OPTIMIZE PLANT POWER FACTOR $328,879 $538,653 Implemented
MZ0293 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,762 $88,053 Implemented
MZ0293 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,827 $320 Implemented
MZ0290 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,247 $2,264 Implemented
MZ0290 # 05 Y:2020 05 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,411 $298 Implemented
MZ0290 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,559 $1,091 Implemented
MZ0290 # 01 Y:2020 01 2020 UPGRADE CONTROLS ON COMPRESSORS $4,714 $3,096 Implemented
MZ0290 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $1,134 $4,935 Implemented
MZ0289 # 03 Y:2020 03 2020 USE OPTIMUM THICKNESS INSULATION $3,128 $4,056 Implemented
MZ0289 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,636 $1,117 Implemented
MZ0289 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $2,151 $7,144 Implemented
MZ0289 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,118 $270 Implemented