IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

667

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0293 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,246 $6,782 Implemented
MZ0290 # 01 Y:2020 01 2020 UPGRADE CONTROLS ON COMPRESSORS $4,714 $3,096 Implemented
MZ0290 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $767 $1,272 Not Implemented
MZ0290 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $1,134 $4,935 Implemented
MZ0290 # 05 Y:2020 05 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,411 $298 Implemented
MZ0290 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,247 $2,264 Implemented
MZ0290 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,559 $1,091 Implemented
MZ0290 # 02 Y:2020 02 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,851 $3,250 Not Implemented
MZ0289 # 01 Y:2020 01 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,779 $20,692 Not Implemented
MZ0289 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,118 $270 Implemented
MZ0289 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $2,151 $7,144 Implemented
MZ0289 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,651 $3,250 Not Implemented
MZ0289 # 03 Y:2020 03 2020 USE OPTIMUM THICKNESS INSULATION $3,128 $4,056 Implemented
MZ0289 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,636 $1,117 Implemented
MZ0289 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $1,422 Not Implemented
MZ0280 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,867 $24,520 Not Implemented
MZ0280 # 02 Y:2019 02 2019 USE OPTIMUM THICKNESS INSULATION $23,499 $2,058 Not Implemented
MZ0280 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,503 $24,934 Not Implemented
MZ0280 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,792 $2,148 Not Implemented
MZ0280 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $14,313 $9,858 Not Implemented
MZ0280 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,016 $3,196 Not Implemented
MZ0280 # 07 Y:2019 07 2019 PAY UTILITY BILLS ON TIME $5,205 $0 Not Implemented
MZ0280 # 08 Y:2019 08 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,754 $3,520 Not Implemented
MZ0280 # 09 Y:2019 09 2019 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,436 $8,160 Not Implemented
MZ0280 # 10 Y:2019 10 2019 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,747 $6,080 Not Implemented