Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0201 # 09 Y:1986 | 09 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $590 | $0 | Implemented |
KU0201 # 07 Y:1986 | 07 | 1986 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $740 | $10 | Implemented |
KU0201 # 12 Y:1986 | 12 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $177 | $200 | Implemented |
KU0201 # 05 Y:1986 | 05 | 1986 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $1,243 | $90 | Implemented |
KU0201 # 04 Y:1986 | 04 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,460 | $2,135 | Implemented |
KU0201 # 11 Y:1986 | 11 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $155 | $0 | Implemented |
KU0201 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,483 | $120 | Implemented |
KU0201 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,677 | $1,581 | Implemented |
KU0201 # 13 Y:1986 | 13 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $138 | $0 | Implemented |
KU0193 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $769 | $100 | Implemented |
KU0194 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $393 | $50 | Implemented |
KU0194 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,003 | $1,575 | Implemented |
KU0194 # 01 Y:1986 | 01 | 1986 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $1,687 | $0 | Implemented |
KU0193 # 08 Y:1986 | 08 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $111 | $0 | Implemented |
KU0193 # 05 Y:1986 | 05 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $1,097 | $500 | Implemented |
KU0193 # 03 Y:1986 | 03 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $4,524 | $667 | Implemented |
KU0193 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,876 | $5,003 | Implemented |
KU0187 # 06 Y:1986 | 06 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $136 | $0 | Implemented |
KU0187 # 05 Y:1986 | 05 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $231 | $0 | Implemented |
KU0187 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $218 | $0 | Implemented |
KU0187 # 02 Y:1986 | 02 | 1986 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $1,550 | $2,000 | Implemented |
KU0187 # 01 Y:1986 | 01 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,097 | $193 | Implemented |
KU0185 # 08 Y:1986 | 08 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $105 | $0 | Implemented |
KU0185 # 07 Y:1986 | 07 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $315 | $0 | Implemented |
KU0185 # 04 Y:1986 | 04 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $315 | $60 | Implemented |