IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0239 # 08 Y:1987 08 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $143 $0 Implemented
KU0237 # 06 Y:1987 06 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,203 $200 Implemented
KU0237 # 10 Y:1987 10 1987 INSTALL TIMERS AND/OR THERMOSTATS $3,307 $157 Implemented
KU0239 # 01 Y:1987 01 1987 INSTALL TIMERS AND/OR THERMOSTATS $5,811 $300 Implemented
KU0239 # 07 Y:1987 07 1987 RECOVER WASTE HEAT FROM EQUIPMENT $172 $50 Not Implemented
KU0240 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,996 $4,437 Not Implemented
KU0237 # 08 Y:1987 08 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $519 $0 Implemented
KU0240 # 02 Y:1987 02 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $953 $0 Implemented
KU0237 # 05 Y:1987 05 1987 INSTALL AUTOMATIC STACK DAMPER $313 $250 Not Implemented
KU0237 # 01 Y:1987 01 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,838 $600 Not Implemented
KU0237 # 03 Y:1987 03 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,921 $2,000 Not Implemented
KU0237 # 07 Y:1987 07 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $390 $40 Not Implemented
KU0239 # 05 Y:1987 05 1987 INSTALL TURBULATORS $318 $500 Not Implemented
KU0237 # 02 Y:1987 02 1987 INSTALL AUTOMATIC STACK DAMPER $399 $250 Not Implemented
KU0239 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $410 $79 Implemented
KU0237 # 09 Y:1987 09 1987 IMPROVE LUBRICATION PRACTICES $597 $0 Not Implemented
KU0237 # 04 Y:1987 04 1987 RECOVER WASTE HEAT FROM EQUIPMENT $407 $250 Implemented
KU0239 # 06 Y:1987 06 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $222 $50 Implemented
KU0240 # 03 Y:1987 03 1987 INSTALL TURBULATORS $618 $584 Not Implemented
KU0240 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $149 $42 Not Implemented
KU0239 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $516 $0 Not Implemented
KU0239 # 03 Y:1987 03 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $392 $0 Implemented
KU0234 # 02 Y:1987 02 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,993 $8,000 Not Implemented
KU0234 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $5,345 $4,000 Implemented
KU0234 # 04 Y:1987 04 1987 INSTALL TURBULATORS $4,336 $6,311 Not Implemented