IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0370 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,500 $20,993 Implemented
IA0370 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,432 $955 Not Implemented
IA0370 # 09 Y:2005 09 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,049 $5,655 Not Implemented
IA0370 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,415 $45 Not Implemented
IA0370 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,763 $1,492 Implemented
IA0370 # 07 Y:2005 07 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,192 $0 Implemented
IA0370 # 10 Y:2005 10 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,492 $9,397 Not Implemented
IA0370 # 06 Y:2005 06 2005 DISCONNECT BALLASTS $1,208 $1,260 Not Implemented
IA0370 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $738 $1,792 Not Implemented
IA0370 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $4,488 $4,081 Not Implemented
IA0369 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,440 $1,650 Not Implemented
IA0369 # 12 Y:2005 12 2005 INSTALL OCCUPANCY SENSORS $809 $2,233 Not Implemented
IA0369 # 11 Y:2005 11 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,703 $2,772 Not Implemented
IA0369 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,683 $20,487 Not Implemented
IA0369 # 09 Y:2005 09 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $499,200 $800,000 Not Implemented
IA0369 # 08 Y:2005 08 2005 REDUCE SCRAP PRODUCTION $49,000 $500 Not Implemented
IA0369 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,035 $160 Not Implemented
IA0369 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $250 $349 Not Implemented
IA0369 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $265 $304 Not Implemented
IA0369 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,908 $1,094 Not Implemented
IA0369 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,156 $40 Not Implemented
IA0369 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $464 $51 Not Implemented
BD0285 # 06 Y:2005 06 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $488 $0 Implemented
BD0285 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $900 Implemented
BD0285 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,695 $0 Implemented