IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

172

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0101 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $290 $360 Implemented
MZ0101 # 02 Y:2012 02 2012 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $934 $4,969 Not Implemented
MZ0101 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $6,340 $8,800 Implemented
MZ0101 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,105 $1,160 Implemented
MZ0101 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $199 $297 Implemented
MZ0105 # 03 Y:2012 03 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $12,339 $13,500 Not Implemented
MZ0105 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,823 $28,300 Implemented
MZ0105 # 02 Y:2012 02 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $42,257 $4,645 Implemented
MZ0105 # 04 Y:2012 04 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $8,215 $52,200 Implemented
MZ0105 # 11 Y:2012 11 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1 $1 Not Implemented
MZ0105 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $58,099 $39,870 Not Implemented
MZ0105 # 06 Y:2012 06 2012 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $42,514 $318,000 Not Implemented
MZ0105 # 07 Y:2012 07 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $920 $1,160 Not Implemented
MZ0105 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,476 $1,140 Not Implemented
MZ0105 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,462 $115,696 Not Implemented
MZ0105 # 09 Y:2012 09 2012 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,288 $2,000 Implemented
MZ0100 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $32,458 $30,000 Implemented
MZ0100 # 01 Y:2012 01 2012 INSTALL SPECTRAL REFLECTORS / DELAMP $10,313 $2,550 Implemented
MZ0100 # 02 Y:2012 02 2012 AIR CONDITION ONLY SPACE NECESSARY $4,220 $4,000 Not Implemented
MZ0106 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,068 $26,420 Not Implemented
MZ0106 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $87,874 $6,500 Not Implemented
MZ0106 # 06 Y:2012 06 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $7,267 $25,000 Implemented
MZ0106 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $5,174 $1,750 Implemented
MZ0106 # 09 Y:2012 09 2012 INSTALL OCCUPANCY SENSORS $88,236 $30,000 Not Implemented
MZ0106 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,548 $31,400 Implemented