Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
172
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0101 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $290 | $360 | Implemented |
MZ0101 # 02 Y:2012 | 02 | 2012 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $934 | $4,969 | Not Implemented |
MZ0101 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,340 | $8,800 | Implemented |
MZ0101 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,105 | $1,160 | Implemented |
MZ0101 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $199 | $297 | Implemented |
MZ0105 # 03 Y:2012 | 03 | 2012 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $12,339 | $13,500 | Not Implemented |
MZ0105 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,823 | $28,300 | Implemented |
MZ0105 # 02 Y:2012 | 02 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $42,257 | $4,645 | Implemented |
MZ0105 # 04 Y:2012 | 04 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $8,215 | $52,200 | Implemented |
MZ0105 # 11 Y:2012 | 11 | 2012 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $1 | $1 | Not Implemented |
MZ0105 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $58,099 | $39,870 | Not Implemented |
MZ0105 # 06 Y:2012 | 06 | 2012 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $42,514 | $318,000 | Not Implemented |
MZ0105 # 07 Y:2012 | 07 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $920 | $1,160 | Not Implemented |
MZ0105 # 10 Y:2012 | 10 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,476 | $1,140 | Not Implemented |
MZ0105 # 08 Y:2012 | 08 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,462 | $115,696 | Not Implemented |
MZ0105 # 09 Y:2012 | 09 | 2012 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,288 | $2,000 | Implemented |
MZ0100 # 03 Y:2012 | 03 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $32,458 | $30,000 | Implemented |
MZ0100 # 01 Y:2012 | 01 | 2012 | INSTALL SPECTRAL REFLECTORS / DELAMP | $10,313 | $2,550 | Implemented |
MZ0100 # 02 Y:2012 | 02 | 2012 | AIR CONDITION ONLY SPACE NECESSARY | $4,220 | $4,000 | Not Implemented |
MZ0106 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $55,068 | $26,420 | Not Implemented |
MZ0106 # 04 Y:2012 | 04 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $87,874 | $6,500 | Not Implemented |
MZ0106 # 06 Y:2012 | 06 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $7,267 | $25,000 | Implemented |
MZ0106 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $5,174 | $1,750 | Implemented |
MZ0106 # 09 Y:2012 | 09 | 2012 | INSTALL OCCUPANCY SENSORS | $88,236 | $30,000 | Not Implemented |
MZ0106 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,548 | $31,400 | Implemented |