IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0164 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $1,744 $1,500 Not Implemented
MZ0164 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56,600 $384,000 Implemented
MZ0164 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,200 $1,430 Implemented
MZ0164 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $188,887 $0 Implemented
MZ0164 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,593 $6,500 Implemented
MZ0164 # 04 Y:2014 04 2014 UPGRADE CONTROLS ON COMPRESSORS $24,203 $100,000 Implemented
MZ0164 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $71,454 $0 Implemented
MZ0164 # 07 Y:2014 07 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $47,302 $25,000 Implemented
BD0452 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $2,841 $750 Not Implemented
BD0452 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,686 $1,310 Not Implemented
BD0452 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,825 $4,565 Not Implemented
BD0452 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,830 $600 Implemented
BD0452 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,291 $20 Not Implemented
BD0452 # 09 Y:2014 09 2014 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,911 $80 Not Implemented
BD0452 # 06 Y:2014 06 2014 USE RADIANT HEATER FOR SPOT HEATING $909 $3,300 Not Implemented
BD0452 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $823 $300 Not Implemented
BD0452 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $435 Implemented
MZ0161 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,710 $12,000 Implemented
MZ0161 # 01 Y:2014 01 2014 UPGRADE CONTROLS ON COMPRESSORS $54,484 $150,000 Not Implemented
MZ0161 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $5,393 $11,000 Not Implemented
MZ0161 # 05 Y:2014 05 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $60,132 $0 Not Implemented
MZ0161 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $36,359 $45,000 Not Implemented
MZ0162 # 03 Y:2014 03 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $537 $2,680 Implemented
MZ0162 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $657 $0 Not Implemented
MZ0162 # 05 Y:2014 05 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $560 $2,906 Not Implemented