Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ1015 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO HEAT WATER | $3,319 | $23,760 | n/a |
MZ1015 # 05 Y:2025 | 05 | 2025 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $789 | $0 | n/a |
MZ1015 # 08 Y:2025 | 08 | 2025 | REDUCE VENTILATION AIR | $3,316 | $5,000 | n/a |
MZ1015 # 06 Y:2025 | 06 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $5,010 | $8,640 | n/a |
MZ1015 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $517 | $496 | n/a |
MZ1015 # 07 Y:2025 | 07 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,409 | $3,750 | n/a |
MZ1015 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,677 | $4,600 | n/a |
MZ1015 # 04 Y:2025 | 04 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $14,776 | $6,332 | n/a |
MZ0378 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,972 | $3,500 | n/a |
MZ0378 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $196,374 | $1,560,000 | n/a |
MZ0378 # 02 Y:2025 | 02 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $26,585 | $49,000 | n/a |
MZ0378 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,470 | $750 | n/a |
MZ0378 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,844 | $12,060 | n/a |
MZ0378 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $4,373 | $750 | n/a |
MZ0376 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $4,145 | $1,560 | n/a |
MZ0376 # 02 Y:2025 | 02 | 2025 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $916 | $365 | n/a |
MZ0376 # 03 Y:2025 | 03 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,548 | $54,000 | n/a |
MZ0376 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,889 | $18,327 | n/a |
MZ0376 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,296 | $7,200 | n/a |
MZ0376 # 06 Y:2025 | 06 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,289 | $14,380 | n/a |
MZ0376 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $86,491 | $702,000 | n/a |
MZ0376 # 08 Y:2025 | 08 | 2025 | REDUCE VENTILATION AIR | $3,456 | $6,974 | n/a |
MZ0377 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,928 | $9,400 | n/a |
MZ0377 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $498 | $415 | n/a |
MZ0377 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $26,142 | $43,500 | n/a |