IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0071 # 04 Y:2011 04 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,137 $1,000 Implemented
MZ0071 # 03 Y:2011 03 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $429 $0 Implemented
MZ0071 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $285 $610 Implemented
MZ0071 # 01 Y:2011 01 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,644 $3,400 Not Implemented
MZ0070 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $40,140 $10,000 Implemented
MZ0070 # 06 Y:2011 06 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $209 $200 Not Implemented
MZ0070 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $21,157 $16,730 Not Implemented
MZ0070 # 03 Y:2011 03 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,071 $1,122 Implemented
MZ0070 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,693 $920 Implemented
MZ0070 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,076 $800 Implemented
MZ0070 # 04 Y:2011 04 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,769 $360 Implemented
MZ0074 # 06 Y:2011 06 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $110 $0 Implemented
MZ0074 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $81 $170 Implemented
MZ0074 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,134 $18,500 Implemented
MZ0074 # 03 Y:2011 03 2011 REDUCE HEAT GAIN BY WINDOW TINTING $409 $554 Implemented
MZ0074 # 02 Y:2011 02 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $515 $0 Implemented
MZ0074 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,976 $820 Implemented
MZ0074 # 07 Y:2011 07 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,840 $0 Implemented
MZ0074 # 08 Y:2011 08 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,230 $1,000 Not Implemented
MZ0063 # 06 Y:2011 06 2011 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,235 $2,700 Implemented
MZ0063 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,660 $50 Not Implemented
MZ0063 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,168 $1,200 Implemented
MZ0063 # 03 Y:2011 03 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $886 $3,000 Implemented
MZ0063 # 02 Y:2011 02 2011 ADJUST VENTS TO MINIMIZE ENERGY USE $1,007 $240 Implemented
MZ0063 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $232 $480 Implemented