Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0446 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,927 | $24,500 | n/a |
MS0446 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,646 | $4,652 | n/a |
MS0446 # 02 Y:2025 | 02 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $25,744 | $100,000 | n/a |
MS0446 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $66,685 | $716,889 | n/a |
MS0445 # 04 Y:2025 | 04 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $40,482 | $25,536 | n/a |
MS0445 # 03 Y:2025 | 03 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $395 | $0 | n/a |
MS0445 # 02 Y:2025 | 02 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $8,629 | $44,500 | n/a |
MS0445 # 01 Y:2025 | 01 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $17,535 | $200,000 | n/a |
MS0445 # 05 Y:2025 | 05 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $12,178 | $45,000 | n/a |
MS0445 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,573 | $2,502 | n/a |
MS0445 # 07 Y:2025 | 07 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $27,723 | $35,999 | n/a |
MS0444 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $99,224 | $613,200 | n/a |
MS0444 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,814 | $400 | n/a |
MS0444 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $1,624 | $2,466 | n/a |
MS0444 # 04 Y:2025 | 04 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $52,643 | $67,500 | n/a |
LS2507 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $1,382 | $525 | n/a |
LS2507 # 02 Y:2025 | 02 | 2025 | INSTALL SUB-METERING EQUIPMENT | $3,463 | $3,000 | n/a |
LS2507 # 03 Y:2025 | 03 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $44,252 | $192,732 | n/a |
LS2507 # 04 Y:2025 | 04 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,714 | $65,000 | n/a |
LS2506 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $4,511 | $500 | n/a |
LS2506 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $51,703 | $514,800 | n/a |
LS2506 # 06 Y:2025 | 06 | 2025 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $3,451 | $15,964 | n/a |
LS2506 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,396 | $9,990 | n/a |
LS2506 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $24,849 | $20,250 | n/a |
LS2506 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $50 | n/a |