Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0536 # 07 Y:2003 | 07 | 2003 | IMPROVE SPACE COMFORT CONDITIONING | $50,000 | $301,060 | Not Implemented |
CO0536 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,299 | $132 | Not Implemented |
CO0536 # 05 Y:2003 | 05 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,750 | $1,410 | Not Implemented |
CO0536 # 04 Y:2003 | 04 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,310 | $870 | Not Implemented |
CO0536 # 03 Y:2003 | 03 | 2003 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $3,380 | $8,630 | Not Implemented |
CO0536 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,530 | $1,050 | Implemented |
CO0536 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,720 | $16,720 | Not Implemented |
CO0535 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,820 | $6,420 | Implemented |
CO0535 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $411 | $112 | Implemented |
CO0535 # 07 Y:2003 | 07 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $670 | $1,210 | Not Implemented |
CO0535 # 06 Y:2003 | 06 | 2003 | INSULATE BARE EQUIPMENT | $1,100 | $2,820 | Not Implemented |
CO0535 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,250 | $9,690 | Implemented |
CO0535 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,340 | $750 | Implemented |
CO0535 # 03 Y:2003 | 03 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,160 | $15,760 | Implemented |
CO0535 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $30,840 | $6,420 | Not Implemented |
CO0535 # 09 Y:2003 | 09 | 2003 | MODIFY WORKLOAD | $30,340 | $6,600 | Not Implemented |
UU0039 # 10 Y:2003 | 10 | 2003 | USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS | $1,046 | $1,342 | Not Implemented |
UU0039 # 09 Y:2003 | 09 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,608 | $0 | Implemented |
UU0039 # 08 Y:2003 | 08 | 2003 | OPTIMIZE PLANT POWER FACTOR | $695 | $695 | Implemented |
UU0039 # 07 Y:2003 | 07 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $199 | $660 | Implemented |
UU0039 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $703 | $237 | Implemented |
UU0039 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $1,012 | $832 | Not Implemented |
UU0039 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,929 | $300 | Not Implemented |
UU0039 # 03 Y:2003 | 03 | 2003 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,286 | $1,085 | Implemented |
UU0039 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,754 | $600 | Implemented |