IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0536 # 07 Y:2003 07 2003 IMPROVE SPACE COMFORT CONDITIONING $50,000 $301,060 Not Implemented
CO0536 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,299 $132 Not Implemented
CO0536 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,750 $1,410 Not Implemented
CO0536 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,310 $870 Not Implemented
CO0536 # 03 Y:2003 03 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,380 $8,630 Not Implemented
CO0536 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,530 $1,050 Implemented
CO0536 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,720 $16,720 Not Implemented
CO0535 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,820 $6,420 Implemented
CO0535 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $411 $112 Implemented
CO0535 # 07 Y:2003 07 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $670 $1,210 Not Implemented
CO0535 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $1,100 $2,820 Not Implemented
CO0535 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,250 $9,690 Implemented
CO0535 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,340 $750 Implemented
CO0535 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,160 $15,760 Implemented
CO0535 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,840 $6,420 Not Implemented
CO0535 # 09 Y:2003 09 2003 MODIFY WORKLOAD $30,340 $6,600 Not Implemented
UU0039 # 10 Y:2003 10 2003 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $1,046 $1,342 Not Implemented
UU0039 # 09 Y:2003 09 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,608 $0 Implemented
UU0039 # 08 Y:2003 08 2003 OPTIMIZE PLANT POWER FACTOR $695 $695 Implemented
UU0039 # 07 Y:2003 07 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $199 $660 Implemented
UU0039 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $703 $237 Implemented
UU0039 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $1,012 $832 Not Implemented
UU0039 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,929 $300 Not Implemented
UU0039 # 03 Y:2003 03 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,286 $1,085 Implemented
UU0039 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,754 $600 Implemented