Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 313 | Textile Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0614 # 02 Y:2021 | 02 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $37,679 | $34,222 | Not Implemented |
WV0614 # 03 Y:2021 | 03 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $14,148 | $1,000 | Implemented |
WV0614 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,396 | $38,385 | Implemented |
WV0614 # 05 Y:2021 | 05 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $7,526 | $5,317 | Implemented |
WV0614 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,463 | $2,884 | Implemented |
WV0614 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,283 | $450 | Implemented |
WV0614 # 08 Y:2021 | 08 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,815 | $60 | Implemented |
WV0614 # 09 Y:2021 | 09 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,124 | $1,083 | Implemented |
WV0614 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $399,970 | $573,165 | Not Implemented |
NC0666 # 04 Y:2021 | 04 | 2021 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,768 | $10,000 | n/a |
NC0666 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,259 | $50 | n/a |
NC0666 # 02 Y:2021 | 02 | 2021 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $24,876 | $50,000 | n/a |
NC0666 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,200 | $51,808 | n/a |
CL2105 # 05 Y:2021 | 05 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $567,975 | $4,358,847 | Not Implemented |
CL2105 # 06 Y:2021 | 06 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $63 | $0 | Implemented |
CL2105 # 07 Y:2021 | 07 | 2021 | USE OPTIMUM TEMPERATURE | $81,375 | $0 | Not Implemented |
CL2105 # 08 Y:2021 | 08 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $25,046 | $7,102 | Not Implemented |
CL2105 # 09 Y:2021 | 09 | 2021 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $24,497 | $17,450 | Not Implemented |
CL2105 # 10 Y:2021 | 10 | 2021 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $2,591 | $600 | Implemented |
CL2105 # 11 Y:2021 | 11 | 2021 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $982 | $3,050 | Not Implemented |
CL2105 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,819 | $2,100 | Implemented |
CL2105 # 03 Y:2021 | 03 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $34,939 | $1,120 | Not Implemented |
CL2105 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $25,163 | $8,200 | Implemented |
CL2105 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $69,993 | $55,908 | Implemented |