IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
Reset
SIC 228 Yarn And Thread Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0202 # 02 Y:2000 02 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,464 $865 Implemented
NC0202 # 03 Y:2000 03 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,647 $0 Implemented
NC0202 # 04 Y:2000 04 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $108 $200 Not Implemented
NC0202 # 05 Y:2000 05 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $18,762 $3,000 Not Implemented
NC0202 # 06 Y:2000 06 2000 RECOVER AND REUSE COOLING WATER $2,950 $2,000 Implemented
NC0200 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $20,439 $27,000 n/a
NC0200 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,705 $51,300 n/a
NC0200 # 03 Y:2000 03 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $921 $1,000 n/a
NC0200 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,871 $10,600 n/a
NC0200 # 05 Y:2000 05 2000 METER WASTE WATER $15,526 $7,025 n/a
NC0168 # 01 Y:1999 01 1999 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $11,533 $10,000 Not Implemented
NC0168 # 02 Y:1999 02 1999 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $38,680 $200,000 Not Implemented
NC0168 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $34,792 $5,000 Not Implemented
NC0168 # 04 Y:1999 04 1999 BURN WASTE OIL FOR HEAT $787 $2,000 Not Implemented
NC0168 # 05 Y:1999 05 1999 METER WASTE WATER $16,740 $3,500 Not Implemented
NC0160 # 01 Y:1999 01 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,733 $1,400 Implemented
NC0160 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,043 $2,000 Implemented
NC0160 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,992 $6,000 Not Implemented
NC0160 # 04 Y:1999 04 1999 INSTALL SKYLIGHTS $1,207 $2,000 Implemented
NC0160 # 05 Y:1999 05 1999 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $21,795 $20,000 Not Implemented
NC0160 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,045 $1,550 Implemented
NC0160 # 07 Y:1999 07 1999 $49,559 $100,000 Implemented
NC0141 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $556 $60 Implemented
NC0141 # 02 Y:1998 02 1998 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,943 $10,000 Implemented
NC0141 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,183 $4,236 Implemented