IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

119

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0207 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $16,705 $10,000 Implemented
NC0207 # 04 Y:2001 04 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,272 $12,600 Implemented
NC0207 # 05 Y:2001 05 2001 AIR CONDITION ONLY SPACE NECESSARY $13,400 $12,400 Implemented
TN0675 # 03 Y:2000 03 2000 $18,800 $16,000 Implemented
TN0675 # 04 Y:2000 04 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,789 $16,600 Implemented
TN0675 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $8,725 $6,000 Implemented
TN0675 # 06 Y:2000 06 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,450 $3,300 Implemented
TN0659 # 01 Y:1999 01 1999 $135,000 $32,200 Implemented
TN0659 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $4,642 $1,860 Implemented
NC0125 # 06 Y:1997 06 1997 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $129,253 $33,480 Implemented
NC0026 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $972 $210 Implemented
NC0026 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,139 $1,646 Implemented
NC0026 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,424 $500 Implemented
NC0019 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,350 $270 Implemented
NC0003 # 01 Y:1993 01 1993 USE PHOTOCELL CONTROLS $381 $159 Implemented
NC0003 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $648 $360 Implemented
NC0003 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,625 $300 Implemented
NC0003 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,844 $1,000 Implemented
NC0003 # 05 Y:1993 05 1993 RECOVER WASTE HEAT FROM EQUIPMENT $6,594 $6,000 Implemented
NC0003 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $307 $650 Implemented
TN0353 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $1,253 $2,380 Implemented
TN0353 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,936 $780 Implemented
TN0353 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,251 $0 Implemented
TN0353 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $689 Implemented
AT0099 # 01 Y:1988 01 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,458 $30,640 Implemented