IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0652 # 01 Y:1999 01 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $189,625 $28,000 Implemented
TN0652 # 10 Y:1999 10 1999 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $16,210 $10,000 Not Implemented
TN0652 # 08 Y:1999 08 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $96,250 $400,000 Not Implemented
TN0652 # 09 Y:1999 09 1999 REPAIR AND ELIMINATE STEAM LEAKS $28,970 $300 Not Implemented
TN0652 # 02 Y:1999 02 1999 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $34,710 $27,240 Not Implemented
TN0652 # 05 Y:1999 05 1999 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $5,625 $16,000 Implemented
TN0652 # 04 Y:1999 04 1999 MODIFY CURRENT INCENTIVE PROGRAM $18,000 $49,200 Implemented
TN0652 # 06 Y:1999 06 1999 REPAIR AND ELIMINATE STEAM LEAKS $4,000 $100 Implemented
TN0652 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,700 $4,000 Implemented
TN0652 # 03 Y:1999 03 1999 RECOVER AND REUSE WASTE MATERIAL $23,000 $60,500 Implemented
NC0180 # 07 Y:1999 07 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $47,820 $68,000 Implemented
NC0180 # 06 Y:1999 06 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $15,265 $1,500 Implemented
NC0180 # 01 Y:1999 01 1999 ADJUST BURNERS FOR EFFICIENT OPERATION $8,324 $2,000 Implemented
NC0180 # 05 Y:1999 05 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $188 $300 Not Implemented
NC0180 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $15,440 $53,360 Implemented
NC0180 # 04 Y:1999 04 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,175 $3,250 Implemented
NC0180 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,282 $1,500 Implemented
NC0177 # 03 Y:1999 03 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $8,265 $420 Not Implemented
NC0177 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,366 $2,141 Implemented
NC0177 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $434 $120 Implemented
NC0177 # 04 Y:1999 04 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $450 $500 Implemented
NC0177 # 05 Y:1999 05 1999 RECOVER AND REUSE COOLING WATER $97,444 $35,500 Implemented
NC0178 # 03 Y:1999 03 1999 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $15,967 $6,000 Not Implemented
NC0178 # 02 Y:1999 02 1999 CHECK FOR ACCURACY OF UTILITY / POWER METERS $14,400 $5,600 Implemented
NC0178 # 05 Y:1999 05 1999 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $10,689 $16,800 Not Implemented