IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

248

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0124 # 10 Y:1997 10 1997 IMPLEMENT A MACHINE AND COOLANT SUMP CLEANING PROGRAM TO MINIMIZE COOLANT CONTAMINATION $7,405 $0 Implemented
NC0124 # 09 Y:1997 09 1997 MINIMIZE WATER USAGE $2,770 $5,910 Not Implemented
NC0124 # 08 Y:1997 08 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,572 $2,000 Implemented
NC0124 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,913 $6,240 Implemented
NC0124 # 06 Y:1997 06 1997 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $245 $10 Not Implemented
NC0124 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $790 $270 Implemented
NC0124 # 04 Y:1997 04 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,906 $6,030 Not Implemented
NC0124 # 03 Y:1997 03 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,715 $15,000 Not Implemented
NC0124 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,826 $401 Not Implemented
NC0124 # 01 Y:1997 01 1997 AIR CONDITION ONLY SPACE NECESSARY $9,590 $3,000 Implemented
TN0618 # 07 Y:1997 07 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,360 $540 n/a
TN0618 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,200 $990 n/a
TN0618 # 05 Y:1997 05 1997 REUSE / RECYCLE/ SELL PAPER PRODUCTS $8,415 $6,640 n/a
TN0618 # 04 Y:1997 04 1997 REPAIR AND ELIMINATE STEAM LEAKS $13,230 $1,960 n/a
TN0618 # 03 Y:1997 03 1997 $16,000 $10,000 n/a
TN0618 # 02 Y:1997 02 1997 COVER OPEN TANKS $19,880 $0 n/a
TN0618 # 01 Y:1997 01 1997 INSULATE BARE EQUIPMENT $32,090 $46,680 n/a
NC0127 # 08 Y:1997 08 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,985 $2,850 Not Implemented
NC0127 # 05 Y:1997 05 1997 REDESIGN PROCESS $519 $50 Not Implemented
NC0127 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,930 $1,880 Implemented
NC0127 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $130 $125 Not Implemented
NC0127 # 03 Y:1997 03 1997 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,143 $2,915 Not Implemented
NC0127 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $2,940 $17,640 Not Implemented
NC0127 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $109,730 $100,000 Not Implemented
NC0127 # 07 Y:1997 07 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $136,000 $100,000 Not Implemented