IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

229

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0444 # 01 Y:2012 01 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $5,257 $2,000 Implemented
NC0444 # 02 Y:2012 02 2012 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $3,445 $8,500 Not Implemented
NC0444 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,731 $500 Implemented
NC0444 # 04 Y:2012 04 2012 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,902 $4,000 Implemented
NC0444 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,178 $971 Implemented
NC0444 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,844 $62,067 Not Implemented
NC0444 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,193 $53,707 Not Implemented
NC0444 # 08 Y:2012 08 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,828 $32,000 Not Implemented
NC0443 # 01 Y:2012 01 2012 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $24,834 $105,200 Not Implemented
NC0443 # 02 Y:2012 02 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,610 $27,000 Not Implemented
NC0443 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,514 $500 Not Implemented
NC0443 # 04 Y:2012 04 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,960 $10,175 Not Implemented
NC0443 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $633 $2,440 Not Implemented
NC0443 # 06 Y:2012 06 2012 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $28,327 $96,000 Not Implemented
NC0441 # 01 Y:2012 01 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,551 $44,599 Implemented
NC0441 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $875 $0 Implemented
NC0441 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $161 $100 Implemented
NC0441 # 04 Y:2012 04 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $782 $300 Not Implemented
NC0441 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $9,319 $1,000 Not Implemented
NC0441 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,151 $1,000 Not Implemented
NC0441 # 07 Y:2012 07 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $350 $800 Implemented
NC0441 # 08 Y:2012 08 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $462 $600 Implemented
NC0441 # 09 Y:2012 09 2012 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,800 $1,000 Not Implemented
NC0441 # 10 Y:2012 10 2012 REPAIR OR REPLACE STEAM TRAPS $1,119 $1,000 Implemented
NC0441 # 11 Y:2012 11 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,596 $4,760 Implemented