Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0265 # 09 Y:1988 | 09 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,325 | $0 | Implemented |
KU0263 # 04 Y:1988 | 04 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,486 | $1,308 | Implemented |
KU0263 # 06 Y:1988 | 06 | 1988 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $187 | $0 | Implemented |
KU0263 # 07 Y:1988 | 07 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $269 | $0 | Implemented |
KU0263 # 08 Y:1988 | 08 | 1988 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $108 | $0 | Not Implemented |
KU0265 # 01 Y:1988 | 01 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,309 | $2,400 | Not Implemented |
KU0265 # 02 Y:1988 | 02 | 1988 | INSTALL SET-BACK TIMERS | $1,548 | $400 | Not Implemented |
KU0265 # 03 Y:1988 | 03 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,892 | $5,000 | Implemented |
KU0265 # 04 Y:1988 | 04 | 1988 | INSTALL TURBULATORS | $2,263 | $1,250 | Implemented |
KU0265 # 05 Y:1988 | 05 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $771 | $0 | Implemented |
KU0265 # 06 Y:1988 | 06 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $606 | $700 | Implemented |
KU0265 # 07 Y:1988 | 07 | 1988 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $1,623 | $4,500 | Not Implemented |
KU0265 # 08 Y:1988 | 08 | 1988 | IMPROVE LUBRICATION PRACTICES | $4,120 | $0 | Implemented |
KU0263 # 09 Y:1988 | 09 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $610 | $920 | Not Implemented |
KU0265 # 10 Y:1988 | 10 | 1988 | MINIMIZE WATER USAGE | $9,368 | $6,400 | Implemented |
KU0265 # 11 Y:1988 | 11 | 1988 | RECOVER AND REUSE COOLING WATER | $7,327 | $6,400 | Implemented |
KU0266 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $487 | $282 | Implemented |
KU0266 # 02 Y:1988 | 02 | 1988 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,274 | $1,008 | Implemented |
KU0266 # 03 Y:1988 | 03 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,166 | $7,300 | Not Implemented |
KU0266 # 04 Y:1988 | 04 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,624 | $100 | Implemented |
KU0266 # 05 Y:1988 | 05 | 1988 | RECOVER AND REUSE COOLING WATER | $791 | $860 | Implemented |
KU0266 # 06 Y:1988 | 06 | 1988 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $1,336 | $1,300 | Not Implemented |
KU0266 # 07 Y:1988 | 07 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $898 | $1,500 | Implemented |
KU0266 # 08 Y:1988 | 08 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $406 | $580 | Not Implemented |
KU0266 # 09 Y:1988 | 09 | 1988 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $396 | $580 | Implemented |