IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0071 # 12 Y:1993 12 1993 RECOVER WASTE HEAT FROM EQUIPMENT $8,254 $9,000 Not Implemented
IA0071 # 11 Y:1993 11 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $310 $520 Not Implemented
IA0071 # 10 Y:1993 10 1993 REPAIR OR REPLACE STEAM TRAPS $688 $1,980 Implemented
IA0071 # 09 Y:1993 09 1993 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,737 $25,000 Implemented
IA0071 # 08 Y:1993 08 1993 RECOVER WASTE HEAT FROM EQUIPMENT $18,182 $3,000 Not Implemented
IA0071 # 07 Y:1993 07 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,748 $25 Implemented
IA0071 # 06 Y:1993 06 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $501 $612 Not Implemented
IA0071 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,546 $6,061 Implemented
IA0071 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $11,929 $12,579 Implemented
IA0071 # 02 Y:1993 02 1993 INSTALL TIMERS AND/OR THERMOSTATS $1,895 $1,250 Implemented
IA0071 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $151 $0 Implemented
IA0071 # 04 Y:1993 04 1993 INSTALL OCCUPANCY SENSORS $977 $1,477 Not Implemented
KU0412 # 07 Y:1993 07 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,133 $20,000 Not Implemented
KU0412 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,619 $53,048 Not Implemented
KU0412 # 05 Y:1993 05 1993 RECOVER AND REUSE COOLING WATER $11,879 $200 Implemented
KU0412 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,454 $190 Implemented
KU0412 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $6,463 $8,750 Not Implemented
KU0412 # 08 Y:1993 08 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,964 $6,000 Not Implemented
KU0412 # 09 Y:1993 09 1993 USE SYNTHETIC LUBRICANT $1,426 $0 Not Implemented
KU0412 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $122 $480 Implemented
KU0412 # 03 Y:1993 03 1993 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $12,010 $17,000 Not Implemented
KU0412 # 10 Y:1993 10 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $548 $946 Implemented
KU0411 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $294 $171 Implemented
KU0411 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,229 $710 Implemented
KU0411 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,681 $35,000 Not Implemented