IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0511 # 11 Y:1998 11 1998 AUTOMATE FINISHING PROCESS $12,150 $42,810 Not Implemented
KU0511 # 10 Y:1998 10 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,070 $17,000 Implemented
KU0511 # 15 Y:1998 15 1998 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $1,300 $800 Not Implemented
KU0511 # 14 Y:1998 14 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,120 $4,400 Not Implemented
KU0511 # 09 Y:1998 09 1998 MODIFY STARTUP/SHUTDOWN TIMES $75,530 $0 Not Implemented
KU0511 # 12 Y:1998 12 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,560 $690 Implemented
KU0511 # 08 Y:1998 08 1998 INSULATE BARE EQUIPMENT $230 $680 Implemented
KU0511 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $590 $360 Implemented
KU0511 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,670 $3,960 Implemented
KU0511 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,560 $800 Implemented
KU0511 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $2,570 $2,550 Implemented
KU0511 # 03 Y:1998 03 1998 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,080 $3,040 Implemented
KU0511 # 13 Y:1998 13 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $4,980 $10,000 Implemented
KU0511 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $25,680 $19,610 Implemented
KU0511 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,600 $32,720 Not Implemented
KU0510 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $1,350 $2,310 Implemented
KU0510 # 01 Y:1998 01 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,740 $200 Implemented
KU0510 # 07 Y:1998 07 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $3,900 $11,720 Not Implemented
KU0510 # 06 Y:1998 06 1998 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $14,350 $8,630 Not Implemented
KU0510 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $400 Implemented
KU0510 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $350 $1,000 Implemented
KU0510 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,670 $900 Implemented
KU0510 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,400 $4,710 Implemented
IA0210 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $134 $282 Implemented
IA0210 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,766 $4,820 Implemented