Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0511 # 11 Y:1998 | 11 | 1998 | AUTOMATE FINISHING PROCESS | $12,150 | $42,810 | Not Implemented |
KU0511 # 10 Y:1998 | 10 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,070 | $17,000 | Implemented |
KU0511 # 15 Y:1998 | 15 | 1998 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $1,300 | $800 | Not Implemented |
KU0511 # 14 Y:1998 | 14 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $4,120 | $4,400 | Not Implemented |
KU0511 # 09 Y:1998 | 09 | 1998 | MODIFY STARTUP/SHUTDOWN TIMES | $75,530 | $0 | Not Implemented |
KU0511 # 12 Y:1998 | 12 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,560 | $690 | Implemented |
KU0511 # 08 Y:1998 | 08 | 1998 | INSULATE BARE EQUIPMENT | $230 | $680 | Implemented |
KU0511 # 07 Y:1998 | 07 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $590 | $360 | Implemented |
KU0511 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,670 | $3,960 | Implemented |
KU0511 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,560 | $800 | Implemented |
KU0511 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,570 | $2,550 | Implemented |
KU0511 # 03 Y:1998 | 03 | 1998 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,080 | $3,040 | Implemented |
KU0511 # 13 Y:1998 | 13 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $4,980 | $10,000 | Implemented |
KU0511 # 01 Y:1998 | 01 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,680 | $19,610 | Implemented |
KU0511 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,600 | $32,720 | Not Implemented |
KU0510 # 08 Y:1998 | 08 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $1,350 | $2,310 | Implemented |
KU0510 # 01 Y:1998 | 01 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,740 | $200 | Implemented |
KU0510 # 07 Y:1998 | 07 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $3,900 | $11,720 | Not Implemented |
KU0510 # 06 Y:1998 | 06 | 1998 | CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS | $14,350 | $8,630 | Not Implemented |
KU0510 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $310 | $400 | Implemented |
KU0510 # 04 Y:1998 | 04 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $350 | $1,000 | Implemented |
KU0510 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,670 | $900 | Implemented |
KU0510 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,400 | $4,710 | Implemented |
IA0210 # 05 Y:1998 | 05 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $134 | $282 | Implemented |
IA0210 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,766 | $4,820 | Implemented |