Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0742 # 04 Y:2015 | 04 | 2015 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $9,330 | $1,000 | Not Implemented |
MA0742 # 08 Y:2015 | 08 | 2015 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,024 | $11,650 | Implemented |
MA0742 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,465 | $11,685 | Implemented |
MA0742 # 03 Y:2015 | 03 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24,583 | $5,560 | Implemented |
MA0742 # 02 Y:2015 | 02 | 2015 | OPTIMIZE PLANT POWER FACTOR | $38,357 | $25,972 | Implemented |
MA0742 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,116 | $9,000 | Implemented |
MA0742 # 01 Y:2015 | 01 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $55,652 | $120,000 | Not Implemented |
MA0742 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,112 | $4,285 | Not Implemented |
ME0269 # 07 Y:1999 | 07 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,202 | $10,069 | Implemented |
ME0269 # 15 Y:1999 | 15 | 1999 | MINIMIZE WATER USAGE | $229 | $100 | Implemented |
ME0269 # 14 Y:1999 | 14 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $15,270 | $0 | Not Implemented |
ME0269 # 13 Y:1999 | 13 | 1999 | INSULATE BARE EQUIPMENT | $547 | $273 | Implemented |
ME0269 # 12 Y:1999 | 12 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,273 | $1,632 | Implemented |
ME0269 # 11 Y:1999 | 11 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,837 | $800 | Not Implemented |
ME0269 # 10 Y:1999 | 10 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,179 | $2,000 | Implemented |
ME0269 # 09 Y:1999 | 09 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,296 | $5,114 | Not Implemented |
ME0269 # 08 Y:1999 | 08 | 1999 | INSULATE BARE EQUIPMENT | $4,461 | $650 | Implemented |
ME0269 # 06 Y:1999 | 06 | 1999 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $6,530 | $21,460 | Implemented |
ME0269 # 05 Y:1999 | 05 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,299 | $10,600 | Implemented |
ME0269 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $11,193 | $6,570 | Not Implemented |
ME0269 # 03 Y:1999 | 03 | 1999 | $12,357 | $32,660 | Not Implemented | |
ME0269 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,324 | $1,000 | Implemented |
ME0269 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,778 | $56,288 | Implemented |
MA0224 # 08 Y:1991 | 08 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,542 | $1,060 | Implemented |
MA0224 # 01 Y:1991 | 01 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $46,881 | $0 | Not Implemented |