IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0372 # 09 Y:1996 09 1996 USE MAGNETIC TECHNOLOGY TO TREAT WATER $1,147 $2,800 Not Implemented
MA0372 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,954 $51,942 Not Implemented
MA0372 # 07 Y:1996 07 1996 MODERATE COOLING TOWER OUTLET TEMPERATURE $2,124 $5,084 Not Implemented
MA0372 # 06 Y:1996 06 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $1,195 $645 Not Implemented
MA0372 # 05 Y:1996 05 1996 USE SYNTHETIC LUBRICANT $1,687 $0 Not Implemented
MA0372 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $6,420 $9,000 Not Implemented
MA0372 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,149 $341 Not Implemented
MA0372 # 02 Y:1996 02 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,515 $822 Not Implemented
MA0372 # 01 Y:1996 01 1996 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $25,870 $11,700 Not Implemented
MA0370 # 05 Y:1996 05 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,599 $18,000 Not Implemented
MA0370 # 01 Y:1996 01 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $321,166 $27,000 Not Implemented
MA0370 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,771 $146,000 Not Implemented
MA0370 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,513 $32,940 Not Implemented
MA0370 # 04 Y:1996 04 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,249 $90,000 Not Implemented
MA0363 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,510 $48,558 Not Implemented
MA0363 # 07 Y:1996 07 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $410 $0 Implemented
MA0363 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $723 $700 Not Implemented
MA0363 # 05 Y:1996 05 1996 UPGRADE OBSOLETE EQUIPMENT $1,801 $4,300 Not Implemented
MA0363 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,549 $325 Implemented
MA0363 # 03 Y:1996 03 1996 USE POWER DURING OFF-PEAK PERIODS $7,680 $0 Not Implemented
MA0363 # 02 Y:1996 02 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $7,694 $0 Not Implemented
MA0358 # 05 Y:1996 05 1996 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $377 $0 Not Implemented
MA0358 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $742 $1,100 Not Implemented
MA0358 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,080 $0 Not Implemented
MA0358 # 02 Y:1996 02 1996 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,147 $4,650 Not Implemented