Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0280 # 09 Y:1999 | 09 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $55,341 | $30,500 | Implemented |
ME0280 # 08 Y:1999 | 08 | 1999 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,092 | $1,240 | Implemented |
ME0280 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,619 | $1,000 | Not Implemented |
ME0280 # 06 Y:1999 | 06 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,402 | $4,940 | Implemented |
ME0280 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,204 | $1,000 | Not Implemented |
ME0280 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,958 | $28,528 | Implemented |
ME0280 # 03 Y:1999 | 03 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $15,000 | $0 | Implemented |
ME0280 # 02 Y:1999 | 02 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $105,600 | $6,000 | Implemented |
ME0280 # 01 Y:1999 | 01 | 1999 | INSTALL SENSORS TO DETECT DEFECTS | $243,000 | $20,108 | Implemented |
ME0274 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,882 | $825 | n/a |
ME0274 # 11 Y:1999 | 11 | 1999 | MINIMIZE WATER USAGE | $120 | $85 | n/a |
ME0274 # 10 Y:1999 | 10 | 1999 | MINIMIZE WATER USAGE | $1,674 | $868 | n/a |
ME0274 # 07 Y:1999 | 07 | 1999 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $371 | $980 | n/a |
ME0274 # 09 Y:1999 | 09 | 1999 | ELIMINATE/REDUCE AN OPERATION | $16,433 | $2,400 | n/a |
ME0274 # 08 Y:1999 | 08 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $470 | $100 | n/a |
ME0274 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,182 | $500 | n/a |
ME0274 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,789 | $7,571 | n/a |
ME0274 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,786 | $14,670 | n/a |
ME0274 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,039 | $14,259 | n/a |
ME0274 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $27,426 | $27,050 | n/a |
ME0269 # 08 Y:1999 | 08 | 1999 | INSULATE BARE EQUIPMENT | $4,461 | $650 | Implemented |
ME0269 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,778 | $56,288 | Implemented |
ME0269 # 07 Y:1999 | 07 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,202 | $10,069 | Implemented |
ME0269 # 06 Y:1999 | 06 | 1999 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $6,530 | $21,460 | Implemented |
ME0269 # 03 Y:1999 | 03 | 1999 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $12,357 | $32,660 | Not Implemented |