Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0582 # 10 Y:2005 | 10 | 2005 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,584 | $1,300 | Implemented |
MA0582 # 09 Y:2005 | 09 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,540 | $800 | Implemented |
MA0582 # 08 Y:2005 | 08 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,340 | $25,150 | Implemented |
MA0582 # 07 Y:2005 | 07 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,815 | $7,660 | Implemented |
MA0582 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,599 | $2,010 | Implemented |
MA0582 # 05 Y:2005 | 05 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,602 | $77,760 | Not Implemented |
MA0582 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,153 | $0 | Implemented |
MA0582 # 03 Y:2005 | 03 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $15,630 | $6,540 | Implemented |
MA0582 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,163 | $86,315 | Implemented |
MA0582 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $98,511 | $312,103 | Not Implemented |
MA0581 # 01 Y:2005 | 01 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $165,668 | $1,327,403 | Not Implemented |
MA0581 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,700 | $18,200 | Implemented |
MA0581 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $72,480 | $157,905 | Not Implemented |
MA0581 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,652 | $18,550 | Implemented |
MA0581 # 05 Y:2005 | 05 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $20,531 | $17,435 | Not Implemented |
MA0581 # 06 Y:2005 | 06 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $12,002 | $29,888 | Not Implemented |
MA0581 # 07 Y:2005 | 07 | 2005 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $10,812 | $5,328 | Implemented |
MA0581 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,675 | $4,675 | Implemented |
MA0581 # 09 Y:2005 | 09 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $9,508 | $160 | Implemented |
MA0581 # 10 Y:2005 | 10 | 2005 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $5,166 | $3,100 | Implemented |
MA0581 # 11 Y:2005 | 11 | 2005 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $3,467 | $8,300 | Implemented |
MA0581 # 12 Y:2005 | 12 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,134 | $6,429 | Not Implemented |
MA0579 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,755 | $64,891 | Not Implemented |
MA0579 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $647 | $1,170 | Implemented |
MA0579 # 07 Y:2005 | 07 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,309 | $9,650 | Not Implemented |