Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0750 # 08 Y:2015 | 08 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $537 | $100 | Not Implemented |
MA0750 # 07 Y:2015 | 07 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,007 | $1,500 | Not Implemented |
MA0750 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,138 | $9,144 | Not Implemented |
MA0750 # 05 Y:2015 | 05 | 2015 | IMPROVE COMBUSTION CONTROL CAPABILITY | $5,289 | $2,500 | Not Implemented |
MA0750 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,208 | $3,000 | Not Implemented |
MA0750 # 03 Y:2015 | 03 | 2015 | REDUCE VENTILATION AIR | $15,229 | $15,000 | Not Implemented |
MA0750 # 02 Y:2015 | 02 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,398 | $7,000 | Not Implemented |
MA0750 # 01 Y:2015 | 01 | 2015 | REDUCE VENTILATION AIR | $18,184 | $10,420 | Not Implemented |
MA0742 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,465 | $11,685 | Implemented |
MA0742 # 08 Y:2015 | 08 | 2015 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,024 | $11,650 | Implemented |
MA0742 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,112 | $4,285 | Not Implemented |
MA0742 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,116 | $9,000 | Implemented |
MA0742 # 04 Y:2015 | 04 | 2015 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $9,330 | $1,000 | Not Implemented |
MA0742 # 03 Y:2015 | 03 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24,583 | $5,560 | Implemented |
MA0742 # 02 Y:2015 | 02 | 2015 | OPTIMIZE PLANT POWER FACTOR | $38,357 | $25,972 | Implemented |
MA0742 # 01 Y:2015 | 01 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $55,652 | $120,000 | Not Implemented |
MA0741 # 01 Y:2015 | 01 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $131,224 | $279,750 | Not Implemented |
MA0741 # 06 Y:2015 | 06 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,308 | $2,775 | Not Implemented |
MA0741 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,279 | $7,050 | Not Implemented |
MA0741 # 04 Y:2015 | 04 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $24,147 | $29,732 | Not Implemented |
MA0741 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,787 | $14,025 | Not Implemented |
MA0741 # 02 Y:2015 | 02 | 2015 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $91,436 | $5,000 | Not Implemented |