IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0089 # 02 Y:2012 02 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $7,675 $27,000 Implemented
DL0089 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,880 $0 Implemented
DL0089 # 04 Y:2012 04 2012 REDUCE VENTILATION AIR $620 $81 Implemented
DL0089 # 05 Y:2012 05 2012 USE OPTIMUM THICKNESS INSULATION $1,025 $2,275 Not Implemented
LE0289 # 01 Y:2009 01 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,778 $20,000 Implemented
LE0289 # 02 Y:2009 02 2009 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $12,698 $2,600 Not Implemented
LE0289 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,495 $11,500 Not Implemented
LE0289 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,121 $304 Implemented
LE0289 # 05 Y:2009 05 2009 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,908 $12,000 Not Implemented
LE0289 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,888 $2,824 Implemented
LE0289 # 07 Y:2009 07 2009 USE SOLAR HEAT TO HEAT WATER $1,380 $3,640 Not Implemented
LE0289 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,474 $16,830 Not Implemented
LE0289 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,333 $6,137 Not Implemented
LE0289 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,734 $18,122 Not Implemented
LE0230 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,350 $2,400 Not Implemented
LE0230 # 02 Y:2006 02 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,950 $2,250 Not Implemented
LE0230 # 03 Y:2006 03 2006 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $9,817 $0 Not Implemented
LE0230 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,528 $0 Not Implemented
LE0230 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,758 $900 Not Implemented
LE0230 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $959 $200 Not Implemented
LE0230 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $2,282 $1,500 Not Implemented
LE0230 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,262 $13,497 Not Implemented
LE0226 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $154,145 $75,000 Implemented
LE0226 # 02 Y:2006 02 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $109,146 $363,000 Not Implemented
LE0226 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $81,919 $51,275 Implemented